In respect of the criterion specified under point 1.4(d)(i) of Annex IV to Implementing Regulation (EU) 2019/317, the Commission notes that Hungary refers in the draft performance plan to the additional determined costs incurred over RP4 by the air navigation service provider Hungarocontrol in relation to measures needed for the achievement of the local capacity targets (‘capacity measures’). The presented capacity measures comprise the following main elements:
The training and employment of additional ATCOs in operations in order to handle the expected traffic increase during RP4. This is planned to result over RP4 into an overall increase of over 30 % of the number of ATCOs in operations at the area control centre of Budapest.
The upgrade of the air traffic management (‘ATM’) system.
Other investments in infrastructure, equipment, and radars.