23 3. ASSESSMENT › 3.2. Competition assessment › 3.2.1. Relevant product market definition › 3.2.1.1. The Capacity Remuneration Mechanism (CRM), Decision_act (EU) 2025/477

In forcesince 6 Mar 2025

The applicants describe the situation as follows. Belgium plans to close all nuclear reactors on its territory by 2025, with the exception of the two most recent reactors, one at Doel and one at Tihange. According to Belgian Transmission System Operator Elia [See Elia, Adequacy & flexibility study for Belgium (2024-2034), 29 June 2023, pp. 15, 191, 205, 223, 269, available at https://issuu.com/eliagroup/docs/adequacy_flexibility_study_for_belgium_2024-203?fr=sOTBhNDYxOTUwMTY.], this closure will require the installation of between 2 and 4 GW of additional capacity between now and 2030. However, the operation of the wholesale markets does not provide sufficient incentives for such investment. It is however essential to the energy system that flexible capacity is available. From the point of view of demand, renewable energies, which are intermittent and random, need to be complemented by sufficiently flexible means of production.