ANNEX I TIMELINE FOR SUBMITTING APPLICATIONS AND FOR GENERATING LABELS, Regulation (EU) 2024/3170

In force

The timeline for aircraft operators to submit applications and for the Agency to generate and distribute labels shall be the following.

Obligation | Timeline

Operations of calendar year X-1, to be the basis for the information given to the Agency in accordance with Article 3(4) | 01.01.X-1 to 31.12.X-1

Aircraft operators submit to the Agency their application for the issuance of labels, in accordance with Article 3(1) | By 01.02.X

Aircraft operators report the information listed in Article 3(3) and (4), in accordance with Article 3(2) | By 01.05.X

The Agency estimates the flight emissions of each flight or set of flights, generates and distributes the labels for all flights scheduled for the two upcoming scheduling periods, in accordance with Article 4(1). | By 30.06.X

Validity period of the labels for flights operated in the winter scheduling period, in accordance with Article 4(2)(a). | As of the moment of issuance by the Agency in year X and until the end of the winter scheduling period of years X to X+1, as used in the aircraft operator’s schedule

Validity period of the labels for flights operated in the summer scheduling period, in accordance with Article 4(2)(b). | As of five months before the start of the summer scheduling period of year X+1 and until the end of that scheduling period, as used in the aircraft operator’s schedule