The verifier shall carry out site visits in order to gain sufficient understanding of the procedures described in the monitoring plan and validate that the information therein is accurate.
The verifier shall determine the location or locations of the site visit, taking into consideration the place where the critical mass of relevant data is stored, including electronic or hard copies of documents, and the place where data-flow activities and control activities are carried out.
The verifier shall also determine the activities to be performed and the time needed for the site visit.
The company shall provide the verifier with access to its sites, including to its relevant onshore locations and the relevant ship.
The verifier may carry out a virtual site visit provided that one of the following conditions is fulfilled:
the verifier has sufficient understanding of the ship’s monitoring and reporting systems, including their existence, implementation and effective operation by the company;
the nature and level of complexity of the ship’s monitoring and reporting system are such that a physical site visit is not required;
the verifier is able to obtain and assess all requisite information remotely;
where serious, extraordinary and unforeseeable circumstances, outside the control of the company, prevent the verifier from carrying out a physical site visit and where those circumstances cannot, after using all reasonable efforts, be overcome.
The verifier shall take measures to reduce the verification risk to an acceptable level to obtain reasonable assurance that the monitoring plan is in conformity with Regulation (EU) 2023/1805.
The decision to carry out a virtual site visit shall be made after determining that the conditions for carrying out a virtual site visit are met. The verifier shall inform without undue delay the company of the decision to carry out a virtual site visit and that the conditions for carrying out a virtual site visit are met.
The verifier may waive a site visit or a virtual site visit as referred to in paragraphs 1 and 5 respectively, provided that the conditions laid down in paragraph 5, points (a), (b) and (c), are cumulatively fulfilled.
The verifier shall take measures to reduce the verification risk to an acceptable level to obtain reasonable assurance that the monitoring plan is in conformity with Regulation (EU) 2023/1805.
The decision to waive a site visit shall be made after determining that the conditions for waiving site visits are met. The verifier shall inform the company thereof without undue delay.
A site visit as referred to in paragraphs 1 and 5 shall not be waived in either of the following situations:
when the monitoring plan of a ship is assessed for the first time by the verifier;
where, during the reporting period, there have been modifications to the monitoring plan as referred to in Article 9(2), points (b), (c) and (d), of Regulation (EU) 2023/1805.
Where the verifier carries out a virtual site visit pursuant to paragraph 5, or waives a site visit or a virtual site visit pursuant to paragraph 6, it shall provide due justification in the internal verification documentation.