Recital 68, Regulation (EU) 2024/1991

In forcesince 24 Jun 2024

Considering the importance of addressing consistently the dual challenges of biodiversity loss and climate change, the restoration of biodiversity should take into account the deployment of renewable energy and vice versa. It should be possible to combine restoration activities and the deployment of renewable energy projects, wherever possible, including in renewables acceleration areas and dedicated grid areas. Directive (EU) 2018/2001 requires Member States to carry out a coordinated mapping for the deployment of renewable energy in their territory in order to identify the domestic potential and the available land surface, sub-surface, sea or inland water that are necessary for the installation of renewable energy plants and their related infrastructure, such as grid and storage facilities, including thermal storage, that are required in order to fulfil at least their national contributions towards the revised 2030 renewable energy target. Such necessary areas, including the existing plants and cooperation mechanisms, are to be commensurate with the estimated trajectories and total planned installed capacity by renewable energy technology set in the national energy and climate plans. Member States should designate a sub-set of such areas as renewables acceleration areas. Renewables acceleration areas are specific locations, whether on land or sea, that are particularly suitable for the installation of plants for the production of energy from renewable sources, where the deployment of a specific type of renewable energy is not expected to have significant environmental impacts, in view of the particularities of the selected territory. Member States are to give priority to artificial and built surfaces, such as rooftops and facades of buildings, transport infrastructure and their direct surroundings, parking areas, farms, waste sites, industrial sites, mines, artificial inland water bodies, lakes or reservoirs, and, where appropriate, urban waste water treatment sites, as well as degraded land not usable for agriculture.Directive (EU) 2018/2001 also establishes that Member States be allowed to adopt a plan or plans to designate dedicated infrastructure areas for the development of grid and storage projects that are necessary to integrate renewable energy into the electricity system, where such development is not expected to have a significant environmental impact, such an impact can be duly mitigated or, where that is not possible, compensated for. The aim of such areas is to be to support and complement the renewables acceleration areas. In the designation of renewables acceleration areas and dedicated infrastructure areas, Member States are to avoid protected areas and consider their national restoration plans. Member States should coordinate the development of national restoration plans with the mapping of areas that are required in order to meet at least their national contribution towards the 2030 renewable energy target and, where relevant, with the designation of the renewables acceleration areas and dedicated grid areas. During the preparation of the national restoration plans, Member States should ensure synergies with the build-up of renewable energy and energy infrastructure and with renewables acceleration areas and dedicated grid areas that have already been designated and ensure that the functioning of those areas, including the permit-granting procedures applicable in those areas provided for by Directive (EU) 2018/2001, remain unchanged.