Art. 2 Regulation (EU) 2024/1747

Amendments to Regulation (EU) 2019/943

In force

Regulation (EU) 2019/943 is amended as follows:

(1)

Article 1 is amended as follows:

(a)

points (a) and (b) are replaced by the following:

‘(a) set the basis for an efficient achievement of the objectives of the Energy Union and the objective to achieve climate neutrality by 2050 at the latest, in particular the climate and energy framework for 2030 by enabling market signals to be delivered for increased efficiency, higher share of renewable energy, security of supply, flexibility, system integration through multiple energy carriers, sustainability, decarbonisation and innovation;

(b)

set fundamental principles for well-functioning, integrated electricity markets, which allow all resource providers and electricity customers non-discriminatory market access, enable the development of forward electricity markets to allow suppliers and consumers to hedge or protect themselves against the risk of future volatility in electricity prices, empower and protect consumers, ensure competitiveness on the global market, enhance security of supply and flexibility through demand response, energy storage and other non-fossil flexibility solutions, ensure energy efficiency, facilitate aggregation of distributed demand and supply, and enable market and sectoral integration and market-based remuneration of electricity generated from renewable energy;’

;

(b)

the following points are added:

‘(e) support long-term investment in renewable energy generation, flexibility and grids to enable consumers to make their energy bills affordable and less dependent from fluctuations of short-term electricity market prices, in particular fossil fuel prices in the medium to long-term;

(f)

lay down a framework for the adoption of measures to address electricity price crises.’

;

(2)

Article 2 is amended as follows:

(a)

point (22) is replaced by the following:

‘(22) “capacity mechanism” means a measure to ensure the achievement of the necessary level of resource adequacy by remunerating resources for their availability, excluding measures relating to ancillary services or congestion management;’

;

(b)

the following points are added:

‘(72) “peak hour” means an hour where, on the basis of the forecasts of transmission system operators and, where applicable, NEMOs, the gross electricity consumption or the gross consumption of electricity generated from sources other than renewable sources or the day-ahead wholesale electricity price is expected to be the highest, taking cross-zonal exchanges into account;

(73)

“peak shaving” means the ability of market participants to reduce electricity consumption from the grid at peak hours at the request of the system operator;

(74)

“peak-shaving product” means a market-based product by means of which market participants can provide peak shaving to system operators;

(75)

“regional virtual hub” means a non-physical region covering more than one bidding zone for which a reference price is set on the basis of a methodology;

(76)

“two-way contract for difference” means a contract between a power-generating facility operator and a counterpart, usually a public entity, that provides both minimum remuneration protection and a limit to excess remuneration;

(77)

“power purchase agreement” or “PPA” means a contract under which a natural or legal person agrees to purchase electricity from an electricity producer on a market basis;

(78)

“dedicated measurement device” means a device linked to or embedded in an asset that provides demand response or flexibility services on the electricity market or to system operators;

(79)

“flexibility” means the ability of an electricity system to adjust to the variability of generation and consumption patterns and to grid availability, across relevant market timeframes.’

;

(3)

Article 7 is amended as follows:

(a)

paragraph 1 is replaced by the following:

‘1. Transmission system operators and NEMOs shall jointly organise the management of the integrated day-ahead and intraday markets in accordance with Regulation (EU) 2015/1222. Transmission system operators and NEMOs shall cooperate at Union level or, where more appropriate, at a regional level in order to maximise the efficiency and effectiveness of Union electricity day-ahead and intraday trading. The obligation to cooperate shall be without prejudice to the application of Union competition law. In their functions relating to electricity trading, transmission system operators and NEMOs shall be subject to regulatory oversight by the regulatory authorities pursuant to Article 59 of Directive (EU) 2019/944 and by ACER pursuant to Articles 4 and 8 of Regulation (EU) 2019/942 and shall be subject to transparency obligations and effective supervision against market manipulation as laid down in the relevant provisions of Regulation (EU) No 1227/2011.’

;

(b)

paragraph 2 is amended as follows:

(i)

point (c) is replaced by the following:

‘(c) maximise the opportunities for all market participants to participate in cross-zonal and intra-zonal trade in a non-discriminatory manner and as close as possible to real time across and within all bidding zones;

(ca)

be organised in such a way as to ensure the sharing of liquidity between all NEMOs, at all times, both for cross-zonal and for intra-zonal trade. For the day-ahead market, from one hour before the gate closure time until the latest point in time where day-ahead trade is allowed, NEMOs shall submit all orders for day-ahead products and products with the same characteristics to the single day-ahead coupling on the one hand and shall not organise trading with day-ahead products or products with the same characteristics outside the single day-ahead coupling on the other. For the intraday market, from the single intraday coupling gate opening time until the latest point in time when intraday trading is allowed in a given bidding zone, NEMOs shall submit all orders for intraday products and products with same characteristics to the single intraday coupling on the one hand and shall not organise trading with intraday products or products with same characteristics outside the intraday coupling on the other. Those obligations shall apply to NEMOs, to undertakings which directly or indirectly exercise control over a NEMO, and to undertakings which are directly or indirectly controlled by a NEMO;’

;

(ii)

point (f) is replaced by the following:

‘(f) be transparent and, where applicable, provide information by generation units while at the same time protecting the confidentiality of commercially sensitive information and ensuring trading occurs in an anonymous manner;’

;

(4)

the following articles are inserted:

1.

Where a regional or Union-wide electricity price crisis is declared in accordance with Article 66a of Directive (EU) 2019/944, Member States may request system operators to propose the procurement of peak-shaving products in order to achieve a reduction of electricity demand during peak hours. Such procurement shall be limited to the duration set out in the implementing decision adopted pursuant to Article 66a(1) of Directive (EU) 2019/944.

2.

Where a request is made pursuant to paragraph 1, system operators shall, after consulting stakeholders, submit a proposal setting out the dimensioning and conditions for the procurement and activation of the peak-shaving product to the regulatory authority of the Member State concerned for its approval.

3.

The regulatory authority concerned shall assess the proposal for a peak-shaving product referred to in paragraph 2 as regards achieving a reduction of electricity demand and the impact on wholesale electricity price during peak hours. That assessment shall take into account the need for the peak-shaving product not to unduly distort the functioning of the electricity markets, and not to cause a redirection of demand response services towards peak-shaving products. On the basis of that assessment, the regulatory authority may request the system operator to amend its proposal.

4.

The proposal for a peak-shaving product referred to in paragraph 2 shall comply with the following requirements:

(a)

the dimensioning of the peak-shaving product shall:

(i)

be based on an analysis of the need for an additional service to ensure security of supply without endangering grid stability, of its impact on the market and of its expected costs and benefits;

(ii)

take into account the forecast of demand, the forecast of electricity generated from renewable energy, the forecast of other sources of flexibility in the system, such as energy storage, and the wholesale price impact of the avoided dispatch; and

(iii)

be limited to ensure that forecasted costs do not exceed the expected benefits of the peak-shaving product;

(b)

the procurement of a peak-shaving product shall be based on objective, transparent, market-based and non-discriminatory criteria, shall be limited to demand response and shall not exclude participating assets from accessing other markets;

(c)

the procurement of the peak-shaving product shall take place using competitive bidding, which can be continuous, with selection based on the lowest cost of meeting pre-defined technical and environmental criteria and shall allow the effective participation of consumers, directly or through aggregation;

(d)

the minimum bid size shall not be higher than 100 kW, including through aggregation;

(e)

contracts for a peak-shaving product shall not be concluded more than a week before its activation;

(f)

the activation of the peak-shaving product shall not reduce cross-zonal capacity;

(g)

the activation of the peak-shaving product shall take place before or within the day-ahead market time frame and may be done on the basis of a pre-defined electricity price;

(h)

the activation of the peak-shaving product shall not imply starting fossil fuel-based generation located behind the metering point, in order to avoid increasing greenhouse gas emissions.

5.

The actual reduction of consumption resulting from the activation of a peak-shaving product shall be measured against a baseline, reflecting the expected electricity consumption without the activation of the peak-shaving product. Where a system operator procures a peak-shaving product, that operator shall develop a baseline methodology after consulting market participants, shall, where relevant, take into account the implementing acts adopted pursuant to Article 59(1), point (e), and shall submit it to the regulatory authority concerned for its approval.

6.

The regulatory authority concerned shall approve the proposal of the system operators seeking to procure a peak-shaving product and the baseline methodology submitted in accordance with paragraphs 2 and 5 or shall request the system operators to amend the proposal or the baseline methodology where that proposal or that methodology does not meet the requirements laid down in paragraphs 2, 4 and 5.

7.

By six months after the end of a regional or Union-wide electricity price crisis as referred to in paragraph 1, ACER shall, after consulting stakeholders, assess the impact of using peak-shaving products on the Union electricity market. That assessment shall take into account the need for peak-shaving products not to unduly distort the functioning of the electricity markets, and not to cause a redirection of demand response services towards peak-shaving products. ACER may issue recommendations that regulatory authorities shall take into account in their assessment pursuant to paragraph 3.

8.

By 30 June 2025, ACER shall, after consulting stakeholders, assess the impact of developing peak-shaving products on the Union electricity market under normal market circumstances. That assessment shall take into account the need for peak-shaving products not to unduly distort the functioning of the electricity markets, and not to cause a redirection of demand response services towards peak-shaving products. On the basis of that assessment, the Commission may submit a legislative proposal to amend this Regulation in order to introduce peak-shaving products outside regional or Union-wide electricity price crisis situations.

1.

Without prejudice to Article 19 of Directive (EU) 2019/944, transmission system operators, distribution system operators and relevant market participants, including independent aggregators, may use, upon the consent of the final customer, data from dedicated measurement devices for the observability and settlement of demand response and flexibility services, including from energy storage facilities.

For the purposes of this Article, the use of data from dedicated measurement devices shall comply with Articles 23 and 24 of Directive (EU) 2019/944 and other relevant Union law, including data protection and privacy law, in particular Regulation (EU) 2016/679 of the European Parliament and of the Council [Regulation (EU) 2016/679 of the European Parliament and of the Council of 27 April 2016 on the protection of natural persons with regard to the processing of personal data and on the free movement of such data, and repealing Directive 95/46/EC (General Data Protection Regulation) (OJ L 119, 4.5.2016, p. 1).’;]. Where such data are used for research purposes, information shall be aggregated and anonymised.

2.

Where a final customer does not have a smart meter installed or where the smart meter of a final customer does not deliver the necessary data to provide demand response or flexibility services, including through an independent aggregator, transmission system operators and distribution system operators shall accept the data from a dedicated measurement device, where available, for the settlement of demand response and flexibility services, including energy storage, and shall not discriminate against that final customer in their procurement of flexibility services. That obligation shall apply subject to compliance with the rules and requirements established by the Member States pursuant to paragraph 3.

3.

Member States shall establish the rules and requirements for a dedicated measurement device data validation process to check and ensure the quality and consistency of the relevant data, and interoperability, in accordance with Articles 23 and 24 of Directive (EU) 2019/944 and other relevant Union law.

(5)

Article 8 is amended as follows:

(a)

paragraph 1 is replaced by the following:

‘1. NEMOs shall allow market participants to trade energy as close to real time as possible and at least up to the intraday cross-zonal gate closure time. From 1 January 2026, the intraday cross-zonal gate closure time shall not be more than 30 minutes ahead of real time.

1a.

The regulatory authority concerned may, at the request of the transmission system operator concerned, grant a derogation from the requirement laid down in paragraph 1 until 1 January 2029. The transmission system operator shall submit the request to the regulatory authority concerned. That request shall include:

(a)

an impact assessment, taking into account feedback from NEMOs and market participants concerned, demonstrating the negative impact of such a measure on the security of supply in the national electricity system, cost-efficiency, including in relation to existing balancing platforms in accordance with Regulation (EU) 2017/2195, on the integration of renewable energy and on greenhouse gas emissions; and

(b)

an action plan aiming to shorten the intraday cross-zonal gate closure time to 30 minutes ahead of real time by 1 January 2029.

1b.

The regulatory authority may, at the request of the transmission system operator concerned, grant a further derogation from the requirement laid down in paragraph 1 by up to two-and-a-half years from the date of expiry of the period referred to in paragraph 1a. The transmission system operator concerned shall submit the request to the regulatory authority concerned, to the ENTSO for Electricity and to ACER by 30 June 2028. That request shall include:

(a)

a new impact assessment, taking into account feedback from market participants and NEMOs, justifying the need for a further derogation, based on risks to the security of supply in the national electricity system, cost-efficiency, the integration of renewable energy, and greenhouse gas emissions; and

(b)

a revised action plan to shorten the intraday cross-zonal gate closure time to 30 minutes ahead of real time by the date for which extension is requested and no later than the date requested for the derogation.

ACER shall issue an opinion about the cross-border impact of a further derogation within six months of receipt of a request for such a derogation. The regulatory authority concerned shall take that opinion into account before deciding upon a request for further derogation.

1c.

By 1 December 2027, the Commission shall, after consulting NEMOs, ENTSO for Electricity, ACER and relevant stakeholders, submit a report to the European Parliament and to the Council assessing the impact of the implementation of the decreasing of the cross-zonal gate closure time established pursuant to this Article, the costs and benefits, the feasibility and practical solutions towards further decreasing it in order to allow market participants to trade energy as close to real time as possible. The report shall consider the impact on the electricity system security, the cost-efficiency, the benefits to the integration of renewable energy and to the reduction of greenhouse gas emissions.’

;

(b)

paragraph 3 is replaced by the following:

‘3. NEMOs shall provide products for trading in day-ahead and intraday markets which are sufficiently small in size, with minimum bid sizes of 100 kW or less, to allow for the effective participation of demand response, energy storage and small-scale renewables including direct participation by customers, as well as through aggregation.’

;

(6)

Article 9 is replaced by the following:

1.

In accordance with Regulation (EU) 2016/1719, transmission system operators shall issue long-term transmission rights or have equivalent measures in place to allow market participants, including owners of power-generating facilities using renewable energy, to hedge price risks, unless an assessment of the forward market on the bidding zone borders performed by the competent regulatory authorities shows that there are sufficient hedging opportunities in the bidding zones concerned.

2.

Long-term transmission rights shall be allocated, on a regular basis, in a transparent, market based and non-discriminatory manner through a single allocation platform. The frequency of allocation and the maturities of the long-term cross-zonal capacity shall support the efficient functioning of the Union’s forward markets.

3.

The design of the Union’s forward markets shall comprise the necessary tools to improve the ability of market participants to hedge price risks in the internal electricity market.

4.

By 17 January 2026, the Commission shall, after consulting relevant stakeholders, carry out an assessment of the impact of possible measures to achieve the objective referred to in paragraph 3. That impact assessment shall, inter alia, cover:

(a)

possible changes to the frequency of allocation for long-term transmission rights;

(b)

possible changes to the maturities of long-term transmission rights, in particular maturities extended up to at least three years;

(c)

possible changes to the nature of long-term transmission rights;

(d)

ways to strengthen the secondary market; and

(e)

the possible introduction of regional virtual hubs for the forward markets.

5.

As regards regional virtual hubs for the forward markets, the impact assessment carried out pursuant to paragraph 4 shall cover the following:

(a)

the adequate geographical scope of the regional virtual hubs, including the bidding zones that would constitute those hubs and specific situations of bidding zones belonging to two or more virtual hubs, aiming to maximise the price correlation between the reference prices and the prices of the bidding zones constituting regional virtual hubs;

(b)

the level of electricity interconnectivity of Member States, in particular of those Member States below the electricity interconnection targets for 2020 and 2030 laid down in Article 4, point (d)(1), of Regulation (EU) 2018/1999 of the European Parliament and of the Council [Regulation (EU) 2018/1999 of the European Parliament and of the Council of 11 December 2018 on the Governance of the Energy Union and Climate Action, amending Regulations (EC) No 663/2009 and (EC) No 715/2009 of the European Parliament and of the Council, Directives 94/22/EC, 98/70/EC, 2009/31/EC, 2009/73/EC, 2010/31/EU, 2012/27/EU and 2013/30/EU of the European Parliament and of the Council, Council Directives 2009/119/EC and (EU) 2015/652 and repealing Regulation (EU) No 525/2013 of the European Parliament and of the Council (OJ L 328, 21.12.2018, p. 1).];

(c)

the methodology for the calculation of the reference prices for the regional virtual hubs for the forward markets, aiming to maximise the price correlation between the reference price and the prices of the bidding zones constituting a regional virtual hub;

(d)

the possibility for bidding zones to form part of more than one regional virtual hub;

(e)

the ways to maximise trading opportunities for hedging products referencing the regional virtual hubs for the forward markets as well as for long term transmission rights from bidding zones to regional virtual hubs;

(f)

the ways to ensure that the single allocation platform referred to in paragraph 2 offers allocation and facilitates the trading of long-term transmission rights;

(g)

the implications of pre-existing intergovernmental agreements and rights thereunder.

6.

On the basis of the outcome of the impact assessment referred to in paragraph 4 of this Article, the Commission shall, by 17 July 2026, adopt an implementing act to further specify measures and tools to achieve the objectives referred to in in paragraph 3 of this Article and the precise features of those measures and tools. That implementing act shall be adopted in accordance with the examination procedure referred to Article 67(2).

7.

The single allocation platform established in accordance with Regulation (EU) 2016/1719 shall act as an entity offering allocation and facilitating the trading of long-term transmission rights on behalf of transmission system operators. It shall have a legal form as referred to in Annex II to Directive (EU) 2017/1132 of the European Parliament and of the Council [Directive (EU) 2017/1132 of the European Parliament and of the Council of 14 June 2017 relating to certain aspects of company law (OJ L 169, 30.6.2017, p. 46).].

This article is long: the rest is at the official publication.