Member States shall ensure that:
the airports of the trans-European transport network with a total annual passenger traffic volume of more than 12 million passengers are connected to the trans-European railway network, including the high-speed railway network where possible, allowing long distance services by 31 December 2040, except where specific geographic or significant physical constraints prevent such connections;
the airports of the trans-European transport network with a total annual passenger traffic volume of more than four million and less than 12 million passengers are connected to the trans-European railway network or, where the airport is located in or in the vicinity of an urban node of the trans-European railway network, to that urban node, by railway, metro, light rail, tramways, cable car or, exceptionally, other zero emission public transport solutions, by 31 December 2050, except where specific geographic or significant physical constraints prevent such connections;
any airport of the trans-European transport network offers at least one terminal which is open to all operators and users in a non-discriminatory way and which shall apply transparent and non-discriminatory charges;
common basic standards for safeguarding civil aviation against acts of unlawful interference, as adopted by the Union in accordance with Regulation (EC) No 300/2008 of the European Parliament and of the Council [Regulation (EC) No 300/2008 of the European Parliament and of the Council of 11 March 2008 on common rules in the field of civil aviation security and repealing Regulation (EC) No 2320/2002 (OJ L 97, 9.4.2008, p. 72).], apply to the air transport infrastructure;
infrastructure for air traffic management is such as to permit the implementation of the single European sky, in accordance with Regulations (EC) No 549/2004, (EC) No 550/2004, (EC) No 551/2004 and (EU) 2018/1139, of air transport operations, in order to improve the performance and sustainability of the European aviation system, of implementing rules and of Union specifications;
alternative fuels infrastructure is deployed in airports in accordance with Regulation (EU) 2023/1804; and
the airports of the core network and comprehensive network with a total annual passenger traffic volume of more than four million passengers provide infrastructure for pre-conditioned air supply to stationary aircraft at aircraft contact stands used for commercial transport operations by 31 December 2030 for airports of the core network and 31 December 2040 for airports of the comprehensive network.
The total annual passenger volume referred to in points (a), (b) and (g), of the first subparagraph shall be based on the latest available three-year average on 18 July 2024, based on the statistics published by Eurostat.
At the request of a Member State, in duly justified cases, the Commission shall adopt implementing acts granting exemptions in respect of the requirements set out in paragraph 1, points (a), (b) and (g) on the ground of specific geographical or significant physical constraints, the non-existence of a railway system on the territory, negative result of socio-economic cost-benefit analysis, or significant negative impacts on environment or biodiversity. Any such request shall be substantiated with sufficient justification. Member States may request the granting of several exemptions in a single request.
The Commission shall assess the request in the light of the justification provided under the first subparagraph.
The Commission may ask for additional information from the Member State no later than 30 calendar days following the receipt of request pursuant to the first subparagraph. If the Commission considers that the information provided is insufficient, it may ask the Member State to supplement that additional information within 30 calendar days from the receipt of that additional information.
The Commission shall take a decision on the requested exemption no later than six months following the receipt of the request pursuant to the first subparagraph or, in the event that further information has been provided by the Member States concerned pursuant to the third subparagraph, no later than four months following the latest receipt of such information, whichever is later. In the absence of an explicit decision by the Commission within such time-limits, the exemption shall be deemed to be granted.
The Commission shall inform other Member States of the exemptions granted pursuant to this Article.