In light of the seriousness of the circumvention practices in this case, the Commission considered that an additional measure was necessary to monitor the proportion of Indonesian-based SSCR imported into the Union. This monitoring system would work as follows: a declaration will be added to the mill certificate mentioned in recital (196) to state whether the location where the stainless steel to produce the SSCR was originally melted and poured, was in Indonesia or not.
197 5. STRENGTHENING OF THE IMPORT REQUIREMENTS AND MONITORING, Regulation (EU) 2024/1268
In forcesince 6 May 2024