Given their role in ensuring the Union’s security of supply for strategic raw materials, and their contribution to the Union’s open strategic autonomy and the green and digital transition, Strategic Projects should be considered, by the permitting authority responsible, to be in the public interest. It should be possible to authorise Strategic Projects which have an adverse impact on the environment, to the extent they fall within the scope of Directives 2000/60/EC, 92/43/EEC or 2009/147/EC or Union legislative acts regarding the restoration of terrestrial, coastal and freshwater ecosystems where the permitting authority responsible concludes, on the basis of a case-by-case assessment, that the public interest served by the project overrides those impacts, provided that all relevant conditions set out in those legal acts are met. The case-by-case assessment should duly take into account the geological specificity of extraction sites, which constrains decisions on location due to the absence of alternative locations for such sites.
Recital 27, Regulation (EU) 2024/1252
In forcesince 11 Apr 2024
- num:eu=2000/60 (several documents carry this name)
- num:eu=2009/147 (several documents carry this name)