Recital 59, Directive (EU) 2024/1788

In forcesince 13 Jun 2024

The simplification and streamlining of administrative permit granting processes and clear time limits for decisions to be taken by the authorities competent for issuing an authorisation should ensure that the deployment of hydrogen production facilities and hydrogen system infrastructure can occur at an adequate pace without hampering public consultations. Member States should be requested to report on progress made. Grandfathering of authorisations, such as licences, permissions, concessions or approvals, granted under national law for the construction and operation of existing natural gas pipelines and other network assets is needed once the transported gaseous energy carrier in a natural gas pipeline changes from natural gas to (pure) hydrogen. That grandfathering of authorisations should not affect the validity of technical safety requirements for hydrogen infrastructure, nor the possibility for competent authorities to monitor compliance with such requirements and to take appropriate and proportionate enforcement measures, including a possible revocation of the grandfathered authorisations, if justified. This should prevent undue delay in repurposing existing natural gas pipelines and other networks assets for hydrogen transport. It should be avoided that conditions for granting authorisations for hydrogen system infrastructure are materially different unless sufficiently justified. Technical safety considerations might justify a differentiated approach in grandfathering existing or issuing new authorisations. The provisions on authorisation procedures should apply without prejudice to international and Union law, including provisions to protect the environment and human health. Where duly justified on the grounds of extraordinary circumstances, it should be possible to extend the time limits for authorisation procedures by up to one year.