The national building renovation plans should be closely linked with the integrated national energy and climate plans under Regulation (EU) 2018/1999, and progress in achieving the national targets and the contribution of the national building renovation plans to national and Union targets should be reported as part of the biennial reporting under Regulation (EU) 2018/1999. Considering the urgency to scale up renovation on the basis of solid national building renovation plans, the date for the submission of the first national building renovation plan should be set as early as possible. The subsequent national building renovation plans should be submitted as part of the integrated national energy and climate plans and their updates, which means that the second draft national building renovation plan should be submitted with the second draft integrated national energy and climate plans in 2028.
Recital 41, Directive (EU) 2024/1275
In forcesince 24 Apr 2024