Recital 11, Decision_act (EU) 2024/1983

In forcesince 18 Jul 2024

In response to that mandate, on 18 November 2022 the CEPT issued a report [Report 82 from the CEPT to the European Commission in response to the Mandate ‘to develop least restrictive harmonised technical conditions suitable for next-generation (5G) terrestrial wireless systems for priority frequency bands above 24 GHz’, Harmonised least restrictive technical conditions for the 40,5-43,5 GHz frequency band, link: https://docdb.cept.org/document/28574.] (‘CEPT Report 82’) specifying the least restrictive harmonised technical conditions in the 42 GHz frequency band, based on the concept of a Block Edge Mask (BEM), for the introduction of next-generation (5G) terrestrial wireless systems in that band, in compliance with the principles of technology and service neutrality. Those technical conditions are consistent with 5G standardisation developments in particular regarding the channelling arrangements [ETSI TS 138 104 (v16.9.0) defines the 39,5-43,5 GHz frequency band for use with New Radio (NR) technology based on time division duplex (TDD), and channel bandwidths of 50 MHz, 100 MHz, 200 MHz and 400 MHz.] and the use of active antenna systems (AAS), and are therefore conducive to global harmonisation.