2 ANNEX II Template for the notification of voluntary cancellation by a Member State as referred to in Article 25(1), Regulation (EU) 2023/2830

In forcesince 17 Oct 2023

Notification pursuant to Article 12(4) of Directive 2003/87/EC

1.

| Member State and public authority submitting the notification:

2.

| Date of the notification:

3.

| Identification of the closed electricity generation installation (‘installation’) on the territory of the Member State in accordance with the data recorded in the Union Registry, including the following:

(a)

| The name of the installation:

(b)

| The installation identifier from the Union Registry:

(c)

| The name of the installation operator:

4.

| The date of partial/full closure of the installation and revocation/modification of the greenhouse gas permit:

5.

| Description and reference of the additional national measures that triggered the partial/full closure of the installation:

6.

| The verified emission reports of the installation for the five years preceding the year of the partial/full closure:

7.

| The maximum total volume of allowances to be cancelled:

8.

| The period over which the allowances are to be cancelled:

9.

| A description of the methodology that is to be used to determine the exact volume of allowances to be cancelled for the entire period in which cancellation takes place: