Voluntary schemes shall ensure that economic operators provide auditors with all mass balance data in advance of the audit.
During the initial audit, carried out before an economic operator is allowed to participate in a scheme, the auditor shall check the existence and functioning of the mass balance system.
During subsequent annual audits, the auditor shall check at least the following elements:
list of all sites, that are under the scope of certification. Each site shall have its own mass balance records;
list of all inputs per site and the description of material handled and details of all suppliers;
list of all outputs per site and the description of material handled and details of all customers;
conversion factors applied, in particular in the case of installations processing waste or residues to ensure that the process is not modified to produce more waste or residue material;
any discrepancies between book keeping system and inputs, outputs and balances;
allocation of sustainability characteristics;
equivalence of the sustainability data and the physical stock at the end of the mass balance period.