Art. 5 Regulation (EU) 2022/342

Socioeconomic net benefits of the renewable energy cross-border projects

In forcesince 21 Dec 2021
1.

A project promoter applying for a project to be included in the draft list of renewable energy cross-border projects shall demonstrate that the potential overall cost savings in the deployment of renewables and/or the benefits for system integration, security of supply or innovation that are associated with the project outweigh its costs (‘socioeconomic net benefits’).

2.

The socioeconomic net benefits referred to in the previous paragraph shall be demonstrated for the period, which shall cover at least 15 years, starting with the first year of operation of the project and reflecting its technological lifetime.

3.

The estimation of the project’s socioeconomic net benefits referred to in the first paragraph shall be based on a cost-benefit analysis, prepared by the project promoter. The cost-benefit analysis shall include all elements referred to in point 3 of Annex Part IV of Regulation (EU) 2021/1153 and shall demonstrate the existence of socioeconomic net benefits in comparison to a similar project or renewable energy project implemented by one of the Member States participating in the cooperation agreement.