In respect of point 2.1(a) of Annex IV to Implementing Regulation (EU) 2019/317, the Commission notes that Portugal has presented in the draft performance plan a range of measures for the achievement of the local en route capacity targets. Those measures include the transition to a new Air Traffic Management (ATM) system and Operations (OPS) room, airspace changes including FRA cross-border initiatives, enhanced Air Traffic Flow and Capacity Management (ATFCM) procedures as well as the implementation of a recruitment plan to significantly increase air traffic controller FTEs (+ 25 % by 2024 compared to 2019 levels).
25 COMMISSION ASSESSMENT › Assessment of draft performance targets in the key performance area of capacity, Decision_act (EU) 2022/767
In force