In the framework of its regular review of the recognition of control authorities and control bodies pursuant to Article 2(1) of this Regulation, the Commission shall apply the following rules and amend the list of control authorities and control bodies accordingly pursuant to Article 57(2) of Regulation (EU) 2018/848:
the Commission may at any time amend the specifications relating to a control authority or control body in the list on the basis of the information received;
the Commission may suspend the entry of a control authority or control body from the list either on the basis of the information received, or where the control authority or control body has not supplied sufficient information as required within a period to be determined by the Commission according to the severity of the problem, which shall not be less than 30 days, or where it has not agreed to an on-the-spot examination;
the Commission shall suspend the entry of a control authority or control body from the list where, after a request from the Commission, the control authority or control body fails to take appropriate and timely remedial action within a period to be determined by the Commission according to the severity of the problem, which shall not be less than 30 days;
the Commission shall withdraw the entry of a control authority or control body from the list where:
the control authority or control body does not send on time the annual report referred to in Article 2(2) of this Regulation;
the information included in the annual report is incomplete;
the control authority or control body does not keep available or does not communicate all information related to its technical dossier or control system after a request from the Commission within a period to be determined by the Commission, according to the severity of the problem and which shall not be less than 30 days or in accordance with Article 2(1a);
the control authority or control body does not keep available or does not communicate information on the investigations of a non-compliance;
the control authority or control body fails to take adequate corrective measures in response to the non-compliance and infringements observed;
the control authority or control body does not agree to an on-the-spot examination required by the Commission, or does not send all the information requested under Article 2(5), or if an on-the-spot examination comes up with a negative result due to a systematic malfunctioning of the control measures; or
in any other situation, there is a risk for the consumer to be misled about the true nature of the products certified by the control authority or control body.
Prior to a withdrawal in accordance with point (d) of paragraph 1, the Commission shall request the control authority or control body to remedy the situations referred to in that point within a period to be determined by the Commission according to the severity of the problem, which shall not be less than 30 days.