Recital 11, Regulation (EU) 2020/1070

In forcesince 20 Jul 2020

In order to allow supervision and monitoring by the competent authorities, in particular in cases of multiple adjacent or co-located small-area wireless access points, any operator which deploys small-area wireless access points of Classes E2 or E10 in compliance with the characteristics laid down in this Regulation, should inform the competent authority about the installation in a timely manner. To this end, the operator should submit, no later than two weeks after the installation, a notification to the competent authority about the installation, which includes the location and the technical characteristics of those access points as well as a statement of compliance of the installation with the provisions of this Regulation. In order to ensure an easy process in all Member States, this notification should be submitted to a single information point, such as the one established pursuant to Directive 2014/61/EU of the European Parliament and of the Council [Directive 2014/61/EU of the European Parliament and of the Council of 15 May 2014 on measures to reduce the cost of deploying high-speed electronic communications networks (OJ L 155, 23.5.2014, p. 1).].

  • celex=32014L0061
  • num:eu=2014/61