With respect to the extension to the ports of Zeebrugge and Ghent/Terneuzen, the lines proposed for the extension are already part of the North Sea-Mediterranean rail freight corridor. They form part of the trans-European transport network’s core network (Antwerp-Ghent-Zeebrugge) and comprehensive network (Ghent-Terneuzen), with key infrastructure requirements such as electrification, 22,5 t axle load, 100 km/h speed and 740 m train length already partially or entirely fulfilled by the existing infrastructure.
Recital 5, Decision_act (EU) 2020/2168
In forcesince 17 Dec 2020