Concerning the scheme established by Ministerial Decree of 23 June 2016, it was open to all renewable energy sources except for solar photovoltaic energy. Beneficiaries were divided in three categories depending on the plant power: new large generators (i.e., with installed capacity greater than 5 MW), new middle size generators (e.g., with installed capacity between 500 kW2 and 5 MW this category also includes repowering of generators of any size) and smaller generators (i.e., with installed capacity no larger than 500 kW). The Commission remarked that, for the technologies eligible under the scheme, the Levelized Cost of Energy (‘LCOE’) would be higher than the expected electricity market price and that, without the aid and under normal market conditions, the Net Present Value (‘NPV’) for renewable energy projects would be negative.