The ITU-R Radio Regulations, as amended [http://www.itu.int/pub/R-REG-RR (2020 edition).], introduced global out-of-band emission limits (‘protection limits’) applicable in two stages to next-generation (5G) terrestrial wireless systems capable of providing wireless broadband electronic communications services in the 26 GHz frequency band for the protection of the passive earth exploration satellite service (EESS (passive)) in the 23,6-24 GHz frequency band [For 5G base stations/terminal stations, these are: – 33/– 29 dBW/200MHz until 1 September 2027 (first stage), and – 39/– 35 dBW/200MHz thereafter (second stage).]. Those protection limits are less stringent than the EU-harmonised limits [I.e. the additional baseline limits in Tables 4 and 6 in the Annex to Implementing Decision (EU) 2019/784.]. The application of the first-stage limits in the Union should ensure the timely availability of 5G equipment and facilitate faster investments in 5G infrastructure in the single market. The second-stage limits, together with the requirement that no high-density terrestrial systems for the provision of wireless access services shall be deployed in an appropriate frequency range below 23,6 GHz, ensure the adequate protection of the EESS (passive) as well as meteorological satellite services within the 23,6-24 GHz frequency band.
Recital 3, Decision_act (EU) 2020/590
In forcesince 24 Apr 2020