Recital 4, Regulation (EU) 2019/554

In forcesince 5 Apr 2019

In order to obtain reliable results on the effectiveness of the alternative options, it is necessary to test the alternative means in day-to-day operations. Therefore, the impact of those alternative options should be examined under real conditions in the framework of pilot projects conducted in two phases. In the first phase, infrastructure managers and railway undertakings should carry out pilot projects using alternative means and involving train drivers who fulfil the requirements under point 8 of Annex VI to Directive 2007/59/EC. If in the first phase those pilot projects prove that the alternative means effectively complement the language skills of the driver, then in the second phase the pilot projects should be carried out with train drivers having a lower level of language skills than those required in point 8 of Annex VI to Directive 2007/59/EC and using the alternative means proved effective in the first phase. A derogation should be requested jointly by the railway undertaking and infrastructure manager to the Commission for carrying out the second phase.