Art. 2 Regulation (EU) 2019/331

Definitions

In forcesince 1 Jan 2024cited 11×

For the purposes of this Regulation, the following definitions apply:

(1)

‘incumbent installation’ means any installation carrying out one or more activities listed in Annex I to Directive 2003/87/EC or an activity included in the European Union Emissions Trading System (EU ETS) for the first time in accordance with Article 24 of that Directive, which obtained a greenhouse gas emission permit before or on:

(a)

30 June 2019 for the period 2021-2025,

(b)

30 June 2024 for the period 2026-2030;

(2)

‘product benchmark sub-installation’ means inputs, outputs and corresponding emissions relating to the production of a product for which a benchmark has been set in Annex I;

(3)

‘heat benchmark sub-installation’ means inputs, outputs and corresponding emissions not covered by a product benchmark sub-installation relating to the production of measurable heat or the import of measurable heat from an installation covered by the EU ETS other than installations covered by the EU ETS only for the purposes of Articles 14 and 15 of Directive 2003/87/EC, or both, which is:

(a)

consumed within the installation’s boundaries for the production of products, for the production of mechanical energy other than used for the production of electricity, for heating or cooling other than the consumption for the production of electricity; or

(b)

exported to an installation or other entity not covered by the EU ETS other than district heating with the exception of the export for the production of electricity;

(4)

‘district heating’ means the distribution of measurable heat for the purpose of heating or cooling of space or of production of domestic hot water, through a network, to buildings or sites not covered by EU ETS with the exception of measurable heat used for the production of products and related activities or the production of electricity;

(5)

‘district heating sub-installation’ means inputs, outputs and corresponding emissions not covered by a product benchmark sub-installation relating to the production, the import from an installation covered by the EU ETS, or both, of measurable heat which is exported for the purposes of district heating;

(6)

‘fuel benchmark sub-installation’ means inputs, outputs and corresponding emissions not covered by a product benchmark sub-installation, relating to the production of non-measurable heat, by fuel combustion or from electricity, for the primary purpose of the generation of heat, consumed for the production of products, for the production of mechanical energy other than used for the production of electricity, for heating or cooling other than the consumption for the production of electricity, and including safety flaring;

(7)

‘measurable heat’ means a net heat flow transported through identifiable pipelines or ducts using a heat transfer medium, such as, in particular, steam, hot air, water, oil, liquid metals and salts, for which a heat meter is or could be installed;

(8)

‘heat meter’ means a thermal energy meter (MI-004) within the meaning of Annex VI to Directive 2014/32/EU of the European Parliament and of the Council [Directive 2014/32/EU of the European Parliament and of the Council of 26 February 2014 on the harmonisation of the laws of the Member States relating to the making available on the market of measuring instruments (OJ L 96, 29.3.2014, p. 149).] or any other device to measure and record the amount of thermal energy produced based upon flow volumes and temperatures;

(9)

‘non-measurable heat’ means all heat other than measurable heat;

(10)

‘process emissions sub-installation’ means greenhouse gas emissions listed in Annex I to Directive 2003/87/EC other than carbon dioxide, which occur outside the system boundaries of a product benchmark listed in Annex I to this Regulation, or carbon dioxide emissions, which occur outside the system boundaries of a product benchmark listed in Annex I to this Regulation, as a direct and immediate result of any of the following processes and emissions stemming from the combustion of waste gases for the purpose of the production of measurable heat, non-measurable heat or electricity, provided that emissions that would have occurred from the combustion of an amount of natural gas, equivalent to the technically usable energy content of the combusted incompletely oxidised carbon, are subtracted:

(a)

the chemical, electrolytic or pyrometallurgical reduction of metal compounds in ores, concentrates and secondary materials for a primary purpose other than the generation of heat;

(b)

the removal of impurities from metals and metal compounds for a primary purpose other than the generation of heat;

(c)

the decomposition of carbonates, excluding those for flue gas scrubbing for a primary purpose other than the generation of heat;

(d)

chemical syntheses of products and intermediate products where the carbon bearing material participates in the reaction, for a primary purpose other than the generation of heat;

(e)

the use of carbon containing additives or raw materials for a primary purpose other than the generation of heat;

(f)

the chemical or electrolytic reduction of metalloid oxides or non-metal oxides such as silicon oxides and phosphates for a primary purpose other than the generation of heat;

(11)

‘waste gas’ means a gas containing incompletely oxidised carbon in a gaseous state under standard conditions which is a result of any of the processes listed in point (10), where ‘standard conditions’ means temperature of 273,15 K and pressure conditions of 101325 Pa defining normal cubic metres (Nm3) according to Article 3(50) of Regulation (EU) No 601/2012;

(12)

‘start of normal operation’ means the first day of operations;

(13)

‘safety flaring’ means the combustion of pilot fuels and highly fluctuating amounts of process or residual gases in a unit open to atmospheric disturbances which is explicitly required for safety reasons by relevant permits for the installation;

(14)

‘baseline period’ means the five calendar years preceding the time-limit for submission of data to the Commission pursuant to Article 11(1) of Directive 2003/87/EC;

(15)

‘allocation period’ means the five-year period starting from 1 January 2021 and each subsequent period of five years;

(16)

‘uncertainty’ means a parameter, associated with the result of the determination of a quantity, that characterises the dispersion of the values that could reasonably be attributed to the particular quantity, including the effects of systematic as well as of random factors, expressed in per cent, and describes a confidence interval around the mean value comprising 95 % of inferred values taking into account any asymmetry of the distribution of values;

(17)

‘merger’ means a fusion of two or more installations already holding greenhouse gas permits provided that they are technically connected, operate on the same site and the resulting installation is covered by one greenhouse gas permit;

(18)

‘split’ means a division of an installation into two or more installations that are covered by separate greenhouse gas permits and are run by different operators.

The 10 that are cited most themselves, of 11.

  • Regulation (EU) 2019/18422Law

    … for each relevant sub-installation which apply for the relevant baseline period as defined in Article 2, point (14), of Delegated Regulation (EU) 2019/331, expressed as percentage of reduction; (c) where absolute emission targets are …

  • Regulation (EU) 2023/2441Law

    … emissions, including: (a) historical specific emissions for each year of the relevant baseline period as defined in Article 2(14) of Delegated Regulation (EU) 2019/331, including the following data: (i) historical emissions specific to the …

  • Regulation (EU) 2024/873Lawamends

  • Decision_act (EU) 2021/927Law

    … That logic should continue to apply for subsequent years during the allocation period 2021 to 2025 referred to in Article 2, point 15 of Delegated Regulation (EU) 2019/331.

  • Judgment of the General Court (Second Chamber) of 26 July 2023. Arctic Paper Grycksbo AB v European Commission.Decision

    … die Kommission habe zur Beurteilung, ob die in Rede stehende Anlage unter das EHS fallen könne, zu Unrecht den in Art. 2 Nr. 14 der Delegierten Verordnung 2019/331 festgelegten Bezugszeitraum berücksichtigt. Zur Stützung des zweiten …

    26 Jul 2023 · 62021TJ0269

  • Regulation (EU) 2025/7721Law

    … for each relevant sub-installation which apply for the relevant baseline period as defined in Article 2, point (14), of Delegated Regulation (EU) 2019/331, expressed as percentage of reduction; (c) where absolute emission targets are …

  • EHV 203016Law

    … Behörde befreit den Betreiber einer Anlage auf dessen Antrag jeweils für die Dauer eines Zuteilungszeitraums nach Artikel 2 Absatz 15 der Delegierten Verordnung (EU) 2019/331 von der Pflicht nach § 7 Absatz 1 des …

  • Decision_act (EU) 2026/1862Law

    … should continue to apply for subsequent years during the allocation period from 2026 to 2030 within the meaning of Article 2, point 15 of Delegated Regulation (EU) 2019/331.

  • Opinion of Advocate General Martín y Pérez de Nanclares delivered on 9 September 2026.Decision

    … Článek 2 bod 18 nařízení v přenesené pravomoci 2019/331 upřesňuje, že taková koexistence vyžaduje provozování různých zařízení odlišnými provozovateli. Z toho vyplývá, že o existenci jediného zařízení nebo …

    9 Sep 2026 · 62025TC0702

  • EHV 203016Law