Art. 3 Decision_act (EU) 2019/785

In forcesince 31 May 2024cited 1×

Within 6 months after this Decision takes effect, Member States shall designate and make available the radio spectrum, on a non-interference and non-protected basis, for equipment using ultra-wideband technology provided that such equipment meets the conditions set out in the Annex and it is used indoors or, if it is used outdoors, it is not attached to a fixed installation, a fixed infrastructure or a fixed outdoor antenna.

Equipment using ultra-wideband technology that meets the conditions set out in the Annex shall also be allowed in motor and railway vehicles or be allowed to be attached to a fixed installation or fixed infrastructure or be used with a fixed outdoor antenna where explicitly permitted in the Annex.