Recital 3, Decision_act (EU) 2018/491

In forcesince 21 Mar 2018

The proposal takes account of the criteria set out in Article 4 of Regulation (EU) No 913/2010. The total number of participating countries in the corridor remains at six, and five of them are Member States of the Union. The general alignment of the corridor with the North Sea Mediterranean Core Network Corridor remains unchanged. The proposed extension is consistent with the TEN-T network and complies with the following TEN-T requirements: full electrification of the line tracks, at least 22,5 tonnes axle load, 100 km/h line speed and the possibility of running trains with a length of 740 meters.