The proposal takes account of the criteria set out in Article 4 of the Regulation. The rail freight corridor extensions concern the territory of three Member States (Spain, France and Portugal), while the total number of participating Member States in the corridor remains at four. The new connections will improve the integration of the rail freight corridor with other modes of transport. The extensions will create a new connection with the Mediterranean rail freight corridor at Zaragoza; the consistency of both rail freight corridors, as well as with the TEN-T, is ensured. The extensions are in line with the TEN-T network as those to Zaragoza and Nantes St Nazaire are on the core network, the extension to La Rochelle is part of the comprehensive network and the extension to the Terminal of Valongo is in the catchment area of the TEN-T core node of Porto.
Recital 3, Decision_act (EU) 2018/300
In forcesince 11 Jan 2018