Art. 1 Regulation (EU) 2017/2196

Subject matter

In forcesince 24 Nov 2017

For the purposes of safeguarding operational security, preventing the propagation or deterioration of an incident to avoid a widespread disturbance and the blackout state as well to allow for the efficient and rapid restoration of the electricity system from the emergency or blackout states, this Regulation establishes a network code which lays down the requirements on:

(a)

the management by TSOs of the emergency, blackout and restoration states;

(b)

the coordination of system operation across the Union in the emergency, blackout and restoration states;

(c)

the simulations and tests to guarantee a reliable, efficient and fast restoration of the interconnected transmission systems to the normal state from the emergency or blackout states;

(d)

the tools and facilities needed to guarantee a reliable, efficient and fast restoration of the interconnected transmission systems to the normal state from the emergency or blackout states.