Art. 6 Regulation (EU) 2017/460

Reference price methodology application

In forcesince 16 Mar 2017cited 3×
1.

The reference price methodology shall be set or approved by the national regulatory authority as set out in Article 27. The reference price methodology to be applied shall be subject to the findings of the periodic consultations carried out in accordance with Article 26 by the transmission system operator(s) or the national regulatory authority, as decided by the national regulatory authority.

2.

The application of the reference price methodology shall provide a reference price.

3.

The same reference price methodology shall be applied to all entry and exit points in a given entry-exit system subject to the exceptions set out in Articles 10 and 11.

4.

Adjustments to the application of the reference price methodology to all entry and exit points may only be made in accordance with Article 9 or as a result of one or more of the following:

(a)

benchmarking by the national regulatory authority, whereby reference prices at a given entry or exit point are adjusted so that the resulting values meet the competitive level of reference prices;

(b)

equalisation by the transmission system operator(s) or the national regulatory authority, as decided by the national regulatory authority, whereby the same reference price is applied to some or all points within a homogeneous group of points;

(c)

rescaling by the transmission system operator(s) or the national regulatory authority, as decided by the national regulatory authority, whereby the reference prices at all entry or all exit points, or both, are adjusted either by multiplying their values by a constant or by adding to or subtracting from their values a constant.

  • BGH, Beschluss vom 5. Juli 2022 - EnVR 77/20Decision

    5 Jul 2022 · KORE307272022

  • Judgment of the Court (Seventh Chamber) of 2 October 2025. MET Magyarország Energiakereskedő Zrt. and Global NRG ROM SRL v Magyar EnergetikaDecision

    On 6 April 2017, Regulation 2017/460 entered into force. Article 6(3) thereof provides that the same reference price methodology must be applied to all entry and exit points in a given entry-exit system. The entry into force of that …

    2 Oct 2025 · 62024CJ0369

  • Conseil d'État, 9ème - 10ème chambres réunies, 18/03/2019, 411580Decision

    Enfin, si la société requérante invoque les articles 6 et 8 du règlement 2017/460 de la Commission du 16 mars 2017 établissant un code de réseau sur l'harmonisation des structures tarifaires pour le transport du gaz, ceux-ci …

    18 Mar 2019 · CETATEXT000038244616