Regarding high-speed lines located on the core network corridors covered by this Regulation, if one of the conditions laid down in point 7.3.2.3 in Annex III to Decision 2012/88/EU is fulfilled before the date specified for the same section in Annex I, the railway infrastructure managers should fit ERTMS trackside on that section in accordance with that provision.
Recital 11, Regulation (EU) 2017/6
In forcesince 5 Jan 2017
- celex=32012D0088
- num:eu=2012/88