Recital 7, Decision_act (EU) 2017/258

In force

Concerning the key performance area of capacity, the consistency of the revised targets submitted by Switzerland, as laid down in the FABEC performance plan, for en route Air Traffic Flow Management (ATFM) delay has been assessed, in accordance with the principle laid down in point 4 of Annex IV to Implementing Regulation (EU) No 390/2013, by using the respective FAB reference values for capacity that, when applied, ensure at Union level that the Union-wide performance target is met, calculated by the Network Manager and set out in the Network Operations Plan (2014-2018/2019) in its most recent version (‘Network Operations Plan’). That assessment has demonstrated that those targets are not in conformity with the respective reference values and therefore not consistent with the relevant Union-wide performance target. In addition, the appropriate measures taken by Switzerland are insufficient since they lack concrete timelines with specific milestones and, thus, not adequate in respect to the revision of the targets to be achieved.

  • celex=32013R0390