Information shall be submitted only for those counterparties and portfolios where an actual exposure exists at the reference date in the form of either an Original Exposure or an Exposure after credit risk mitigation, including exposures in stage 3 and counterparties for which the temporary or permanent partial use of the Standardised Approach has been permitted by the respective competent authority in accordance with Article 148 or 150 of Regulation (EU) No 575/2013. Information for counterparties and portfolios for which no exposure exists at the reference date shall not be submitted. Only the following exposures should be reported: those exposures which are subject to the impairment requirements under IFRS 9.5.5.1, excluding purchased or originated credit-impaired financial assets as defined in Appendix A to IFRS 9 as set out in the Annex to Commission Regulation (EC) No 2023/1803 (‘Annex relating to IFRS 9 ’) shall be included.
Information not required or not applicable shall not be submitted; the relevant cells shall either be left blank or NULL. This shall also apply to weighted average quantities that cannot be calculated. Zero values shall be reported only where the intention is to report a quantity of zero. The cells shall not be left blank nor the indication “NULL” shall be inserted to report quantities that are zero.
Monetary amounts shall be reported in the same way as they are reported for calculating own funds requirements at a specific reference date in accordance with Commission Implementing Regulation (EU) 2021/451 [Commission Implementing Regulation (EU) 2021/451 of 17 December 2020 laying down implementing technical standards for the application of Regulation (EU) No 575/2013 of the European Parliament and of the Council with regard to supervisory reporting of institutions and repealing Implementing Regulation (EU) No 680/2014 (OJ L 97, 19.3.2021, p. 1).].
All the templates included in this Annex shall be filled only for the subset of counterparties with the counterparty ID in the following format: ID **_*******_CT_****. Specialised lending exposures as defined in Article 147(8) of Regulation (EU) No 575/2013 shall be excluded.
The PDs shall be expressed as a value between 0 and 1, and shall be expressed with a minimum precision equivalent to four decimals.
Where the facility expires within the year considered for a specific data point, the parameter estimates and the ECL amount to be reported for this facility shall be related to a default event over a 12 months’ period. By way of derogation from this rule, for the purpose of template C 112.00, where the facility expires before the year considered for a specific data point, the facility’s PD shall not be included in the exposure weighted average PD.
In relation to guaranteed exposures, the PD parameter to be reported shall be the one of the original obligors, regardless of whether, for regulatory purposes, the CRM technique is applied via a substitution of the risk parameters of the obligor by the risk parameters of the protection provider. However, the effect of the guarantee shall be taken into consideration in the LGD and in the ECL estimate, in line with the approach used for accounting purposes. Under no circumstances should the PD parameters of a protection provider be reported as the risk parameters of the original obligor.
Information shall be submitted only for those portfolios where an actual exposure exists at the reference date in the form of either an Original Exposure or an Exposure after credit risk mitigation, including exposures in stage 3. Information for portfolios for which no exposure exists at the reference date shall not be submitted. Only the following exposures should be reported: those exposures which are subject to the impairment requirements under IFRS 9.5.5.1, excluding purchased or originated credit-impaired financial assets as defined in Appendix A to IFRS 9 as set out in the Annex to Commission Regulation (EC) No 2023/1803 (‘Annex relating to IFRS 9’) shall be included.
Information not required or not applicable shall not be submitted; the relevant cells shall be left blank or ‘NULL’ shall be inserted. This shall also apply to weighted average quantities that cannot be calculated. Zero values shall be reported only where the intention is to report a quantity of zero. To report quantities that are zero, the cells shall not be left blank nor shall ‘NULL’ be inserted.
Monetary amounts shall be reported in the same way as they are reported for calculating own funds requirements at a specific reference date in accordance with Commission Implementing Regulation (EU) 2021/451 [Commission Implementing Regulation (EU) 2021/451 of 17 December 2020 laying down implementing technical standards for the application of Regulation (EU) No 575/2013 of the European Parliament and of the Council with regard to supervisory reporting of institutions and repealing Implementing Regulation (EU) No 680/2014 (OJ L 97, 19.3.2021, p. 1).].
All the templates included in this Annex shall be filled only for those portfolios included in Annex I, template C 104.00. Specialized lending exposures as defined in Article 147(8) of Regulation (EU) No 575/2013 shall be excluded.
By way of derogation of paragraph 4, for portfolios identified in Annex I, template C.104.00 with a geographical breakdown (all portfolios with column 0050 different than ‘Not applicable””), information shall be reported only when portfolios are considered material. A portfolio is considered material when it has a total exposure equal or higher than 1 % of the total exposure reported for that exposure class (identifiable for each asset class, considering portfolios with column 50, 150 and 200 as “Not applicable” and Column 90 as “non-defaulted”). The total exposure to be considered shall correspond to the sum of the amounts reported respectively in Annex VII, template C.115.00, column 0050 (stage 1 facilities), column 0051 (stage 2 facilities) and column 0052 (stage 3 facilities).
The PDs shall be expressed as a value between 0 and 1 and shall be expressed with a minimum precision equivalent to four decimals.
The ECLs, as well as the IRB expected loss amounts, shall be expressed as a positive number.
Where the facility expires within the year considered for a specific data point, the parameter estimates and the ECL amount to be reported for this facility shall be related to a default event over a 12 months’ period. By way of derogation from this rule, for the purpose of template C.116.00, where the facility expires before the year considered for a specific data point, the facility’s PD shall not be included in the exposure weighted average PD.
In relation to guaranteed exposures, the PD parameter to be reported shall be the one of the original obligors, regardless of whether, for regulatory purposes, the CRM technique is applied via a substitution of the risk parameters of the obligor by the risk parameters of the protection provider. However, the effect of the guarantee shall be taken into consideration in the LGD and in the ECL estimate, in line with the approach used for accounting purposes. Under no circumstances should the PD parameters of a protection provider be reported as the risk parameters of the original obligor.
Data should be reported only with reference to both the on-balance sheet and off-balance sheet exposures in the scope of the impairment requirements of IFRS 9, related to those portfolios included in Annex I, template C.104.00.
Column | Label | Legal reference | Instructions
0010 | Counterparty Code | | The instructions provided in Annex IV to this Implementing Regulation for column 0010 of template C 101 shall apply. This column is a row identifier and shall be unique for each row in the table.
0020 | Number of facilities | | The number of facilities of the counterparty.
0030 | GDP Area Code | |
The code of the geographical area of the counterparty. The geographical area should be the one associated with the estimations of columns 0100 to 0190 of this Annex for column 0010 of template C 114.00. Where the GDP is estimated for the counterparty on a single country basis, the country code shall have the same format as the one used in column 0080 of template C101 of Annex 1 to this Implementing Regulation. Where the GDP is estimated for an area with several countries, one of the following codes shall be used:
‘All countries’: where GDP estimates can be considered as global estimates;
‘European Union (EU)’: where the GDP estimates can be considered as estimates related to the European Union composition at the reference date;
‘Euro Area’: where the GDP estimates can be considered as estimates related to the Euro Area composition at the reference date;
‘Countries of the OECD’: where the GDP estimates can be considered as estimates related to the whole set of jurisdictions which are member countries of the Organisation for Economic Cooperation and Development (OECD) at the reference date.
0040 | Exposure value – IFRS 9 | |
The sum of exposure values to the counterparty over all facilities at the reporting date, as considered for the application of impairment requirements under IFRS 9. This shall include both on- and off-balance sheet exposures in the scope of the impairment requirements of IFRS 9, as well as off-balance sheet exposures after the application of the conversion factors used for accounting purposes.
For both stage 1 and stage 2 facilities, the exposure value for each facility shall be the one associated with default events over the 12 months’ period following the reporting date.
0045 | Gross carrying amount | Appendix A, defined terms of Commission Regulation (EU) 2016/2067 | The sum of the amortised cost at the reporting date, before adjusting for any loss allowance, over all on-balance exposures towards the counterparty, which are in the scope of application of impairment requirements under IFRS 9.
0100 | PD – 12 months IFRS 9 | |
The PD calculated at the counterparty level at the reporting date, representing the probability of a default event within 12 months following the reporting date, as considered in the application of the impairment requirements under IFRS 9. This shall be the PD used to compute the 12 month expected credit loss (ECL amount – 12 months IFRS 9), and associated with the economic scenario 0 in template C112.00.
Where the institution applies different PDs for different exposures to the same counterparty, the weighted average PD at the reporting date shall be reported. The weight used for each facility shall be the exposure value as defined in column 0040 of this template.
Where the PD values associated with the economic scenario 0 of the template C112.00 are not populated, this data point shall not be populated, either.
0110 | PD – IRB without conservative adjustments | Articles 160 and 180 of Regulation (EU) No 575/2013- -Section 4.4.3. of EBA Guidelines on PD estimation, LGD estimation and the treatment of defaulted exposures |
The PD of the counterparty estimated under Articles 160 and 180 of the CRR, free from any Margin of Conservatism, regulatory floors, supervisory add-ons and any other conservative measures, and adjustments,.
Where an institution is not able to isolate the conservative adjustments embedded in its PD estimates, this data point shall either be left blank or NULL.
This data point shall be submitted only for those exposures for which an internal model has been approved and is used in the calculation of risk weighted exposure amounts (RWA). For all other cases, this field shall be left blank or NULL.
0200 | LGD – IFRS 9 | |
The weighted average LGD of the counterparty applied by the institution to the exposures of each counterparty, at the reporting date, as considered in the impairment requirements under IFRS 9 and used to compute the final expected credit loss.
The weight used to compute the LGD weighted average shall be the multiplication of the following two values:
the PD assigned to the facility at the reporting date, representing the probability of a default event within 12 months following the reporting date, as defined in column 0100 of this template;
the exposure value of the facility associated with default events over the 12 months’ period following the reporting date, as defined in column 0040 of this template.
For both stage 1 and stage 2 facilities, the LGD for each facility shall be the one associated with default events over the 12 months’ period following the reporting date.
0400 | ECL amount – 12 months IFRS 9 | Appendix A to IFRS 9 as set out in the Annex to Commission Regulation (EC) No 2023/1803 |
The sum of the expected credit losses to the counterparty over all facilities for the exposures, at the reporting date, as considered for the application of impairment requirements under IFRS 9.
For both stage 1 and stage 2 facilities, the ECL amount for each facility shall be the one associated with default events over the 12 months’ period following the reporting date.
0410 | Expected Loss Amount- IRB | Column 0280 of template 8.1 of Annex I to Implementing Regulation (EU) 2021/451 |
The expected loss amount calculated using IRB parameters.
This data point shall be submitted only for those exposures for which an internal model has been approved and is used in the calculation of RWA. For all other cases, this field shall be left blank or NULL.
0500 |
LGD IFRS 9 Unsecured
12M (Hypothetical)
The hypothetical LGD value that would be applied by the institution, according to the impairment requirements under IFRS 9, to a Senior Unsecured exposure to the counterparty, associated with a default event over the 12 months’ period following the reporting date, shall be reported.. This hypothetical LGD value shall be computed according to the economic scenario 0 in template C112.00 and in accordance with the following:
The exposure is senior and unsecured (no funded nor unfunded credit protection);
No negative pledge clause is in place.
A negative pledge clause is a clause stating that the borrower or debt issuer will not pledge any of its assets to another party.
The PD values reported in columns 0100, 0110, 0120, 0130, 0140, 0150, 0160, 0170, 0180, 0190 shall not incorporate any effect of prepayment. Where the PD model cannot provide PD values beyond the maturity of the facility, these fields shall be left blank or the indication NULL shall be inserted.
Where the ECL amount is calculated as a probability weighted ECL of each economic scenario, the following considerations apply:
Where the IFRS 9 model related to the obligor uses five economic scenarios, the PD values associated with each of the scenario shall be reported for the columns 0100 to 0290. The PD values associated with the economic scenario 0 shall be the weighted average of the PDs reported for the economic scenario 1 to 5, using the weights reported in the columns 0199 to 0209 in the template 114.00 of this Annex.
Where the IFRS 9 model related to the obligor uses a lower number of economic scenarios than five, the rows related to the missing economic scenarios shall not be reported.
Where more than one, but less than 5 economic scenarios are used, the PD values associated with the economic scenario 0 shall be the weighted average of the PDs reported for the economic scenario 1 to 5, using the weights reported in the columns 0199 to 0209 in the template C114.00 of this Annex and 0 for the unused scenarios.
Where the IFRS 9 model related to the obligor uses a higher number of economic scenarios than five, including when performing Monte Carlo simulation, institutions shall report the economic scenario 0 and they shall also map the economic scenarios into the 5 predefined buckets. Where there is no mapping of an institution’s internal scenarios and the five prescribed scenarios, only scenario 0 shall be reported.
Where only a single scenario is used, without any adjustment, neither at the PD level nor at the ECL level that takes into account the non-linearity effects, the PD values for this economic scenario shall be reported under both economic scenarios 0 and 1.
Where the estimation is based on a baseline scenario that is forward-looking and an adjustment is applied to consider the non-linearity effect, the institution shall report in the template the cumulative PD value of the baseline scenario in scenario 1, and the PD used for the purpose of the Significant Increase in Credit Risk (SICR) assessment in scenario 0.
Column | Label | Legal reference | Instructions
0010 | Counterparty Code | | The counterparty code assigned in column 0010 of template C101 of Annex I to this Implementing Regulation to the counterparty included in the low default portfolio (‘LDP’) samples portfolios shall be reported. Columns 0010 and 0020 shall be a composite row identifier and together shall be unique for each row in the table.
0020 | Economic scenario ID | |
The economic scenario used by the institution to calculate the IFRS 9 PD. The scenario ID shall be expressed as a value between 0 and 5. With the exception of specific cases described before, all the 6 economic scenarios shall be populated.
The economic scenario 1 shall be the baseline scenario. The economic scenarios 2 to 5 shall be ranked according to their severity, from the most favourable (number 2) to the most severe (number 5).
0100 | PD – 0 - 12 months | | The cumulative PD assigned to the counterparty representing the probability of a default event within the 12 months after the reporting date, under the economic scenario considered.
0110 | PD – 0 - 24 months | | The cumulative PD assigned to the counterparty representing the probability of a default event within the 24 months after the reporting date, under the economic scenario considered.
0120 | PD – 0 - 36 months | | The cumulative PD assigned to the counterparty representing the probability of a default event within the 36 months after the reporting date, under the economic scenario considered.
0130 | PD – 0 - 48 months | | The cumulative PD assigned to the counterparty representing the probability of a default event within the 48 months after the reporting date, under the economic scenario considered.
0140 | PD – 0 - 60 months | | The cumulative PD assigned to the counterparty representing the probability of a default event within the 60 months after the reporting date, under the economic scenario considered.
0150 | PD – 0 - 72 months | | The cumulative PD assigned to the counterparty representing the probability of a default event within the 72 months after the reporting date, under the economic scenario considered.
0160 | PD – 0 - 84 months | | The cumulative PD assigned to the counterparty representing the probability of a default event within the 84 months after the reporting date, under the economic scenario considered.
0170 | PD – 0 - 96 months | | The cumulative PD assigned to the counterparty representing the probability of a default event within the 96 months after the reporting date, under the economic scenario considered.
0180 | PD – 0 - 108 months | | The cumulative PD assigned to the counterparty representing the probability of a default event within the 108 months after the reporting date, under the economic scenario considered.
0190 | PD – 0 - 120 months | | The cumulative PD assigned to the counterparty representing the probability of a default event within the 120 months after the reporting date, under the economic scenario considered.
Column | Label | Legal reference | Instructions
0010 | Counterparty Code | | The instructions provided in this Annex for column 0010 of C 112.00 shall apply. Columns 0010 and 0020 shall be a composite row identifier and together shall be unique for each row in the table.
0020 | Facility ID | |
The facility ID assigned by the institution to the facility of the counterparty shall be used in a consistent way across time.
Where the institution has more than five facilities toward a given counterparty, it shall report only the five facilities with the highest exposure amount.
0100 | Exposure value – IFRS 9 | |
The exposure value to the facility of the counterparty at the reporting date, as considered for the application of impairment requirements under IFRS 9. This shall include both, on- and off-balance sheet exposures in the scope of the impairment requirements of IFRS 9.
For both stage 1 and stage 2 facilities, the exposure value for each facility shall be the one associated with default events over the 12 months’ period following the reporting date.
0200 | Impairment Status | Paragraph 5 (l) in Part 1 of Annex V to Regulation (EU) 2021/451 |
The stage assigned to the facility to each counterparty at the reporting date shall be reported as follows:
Instruments without significant increase in credit risk (stage 1);
instruments with significant increase in credit risk (stage 2);
Credit impaired instruments (stage 3).
0300 | Annualised originated PD |
IFRS 9.5.5.9
IFRS 9.B5.5.11
IFRS 9.B5.5.13
IFRS 9.B5.5.43
The annualised lifetime PD representing the probability of default assigned to the facility, evaluated at the origination date, used for the assessment of the significant increase in credit risk, calculated in accordance with the following formula:
Annualised lifetime PD1–M1–lifetime PD
where
M is the residual number of years of the maturity of the facility at the reporting date;
lifetime PD is the lifetime PD representing the probability of default assigned to the facility, for the residual number of years at the reporting date, evaluated at the origination date, used for the assessment of the significant increase in credit risk
Where the 12-month PD is used as a proxy for the assessment of the significant increase in credit risk, the 12-month PD evaluated at the origination date shall be reported.
0400 | Annualised PD at reporting date |
IFRS 9.5.5.9
IFRS 9.B5.5.13
IFRS 9.B5.5.14
The annualised lifetime PD representing the probability of default assigned to the facility, evaluated at the reporting date, used for the assessment of the significant increase in credit risk, calculated in accordance with the following formula:
Annualised lifetime PD1–M1–lifetime PD
where:
M is the residual number of years of the maturity of the facility at the reporting date;
lifetime PD is the lifetime PD representing the probability of default assigned to the facility, for the residual number of years at the reporting date, evaluated at the reporting date, used for the assessment of the significant increase in credit risk.