Art. 46 Regulation (EU) 2016/1388

Compliance monitoring for transmission-connected distribution facilities

In forcesince 17 Aug 2016

With regard to compliance monitoring of the reactive power requirements applicable to transmission-connected distribution facilities:

(a)

the transmission-connected distribution facility shall be equipped with necessary equipment to measure the active and reactive power, in accordance with Article 15; and

(b)

the relevant system operator shall specify the time frame for compliance monitoring.