Art. 41 Regulation (EU) 2016/1388

Compliance testing for demand units with demand response active power control, reactive power control and transmission constraint management

In forcesince 17 Aug 2016cited 2×
1.

With regard to the demand modification test:

(a)

the technical capability of the demand unit used by a demand facility or a closed distribution system to provide demand response active power control, demand response reactive power control or demand response transmission constraint management to modify its power consumption, after receiving an instruction from the relevant system operator or relevant TSO, within the range, duration and time frame previously agreed and established in accordance with Article 28, shall be demonstrated, either individually or collectively as part of demand aggregation through a third party;

(b)

the test shall be carried out either by an instruction or alternatively by simulating the receipt of an instruction from the relevant system operator or relevant TSO and adjusting the power demand of the demand facility or the closed distribution system;

(c)

the test shall be deemed passed, provided that the conditions specified by the relevant system operator or relevant TSO pursuant to Article 28(2)(d)(f)(g)(h)(k) and (l) are fulfilled;

(d)

an equipment certificate may be used instead of part of the tests provided for in paragraph 1(b), on the condition that it is provided to the relevant system operator or relevant TSO.

2.

With regard to the disconnection or reconnection of static compensation facilities test:

(a)

the technical capability of the demand unit used by a demand facility owner or closed distribution system operator to provide demand response active power control, demand response reactive power control or demand response transmission constraint management to disconnect or reconnect, or both, its static compensation facility when receiving an instruction from the relevant system operator or relevant TSO, in the time frame expected in accordance with Article 28, shall be demonstrated, either individually or collectively as part of demand aggregation through a third party;

(b)

the test shall be carried out by simulating the receipt of an instruction from the relevant system operator or relevant TSO and subsequently disconnecting the static compensation facility, and by simulating the receipt of an instruction from the relevant system operator or relevant TSO and subsequently reconnecting the facility;

(c)

the test shall be deemed passed, provided that the conditions specified by the relevant system operator or relevant TSO pursuant to Article 28(2)(d)(f)(g)(h)(k) and (l) are fulfilled.

  • Regulation (EU) 2017/219645Law

    … efter to på hinanden følgende mislykkede reaktioner i rigtig drift eller mindst hvert år i henhold til metoden i artikel 41, stk. 1, i forordning (EU) 2016/1388. 2. Hver forsvarsydelsesleverandør, der leverer forbrugsaflastning ved lav …

  • Commission Regulation (EU) 2017/2196 of 24 November 2017 establishing a network code on…45Law

    … consecutive unsuccessful responses in real operation or at least every year, following the methodology laid down in Article 41(1) of Regulation (EU) 2016/1388. 2. Each defence service provider delivering demand response low frequency …