Recital 5, Decision_act (EU) 2015/1056

In forcesince 30 Jun 2015

Concerning the key performance area of capacity, the consistency of the targets submitted by Switzerland, as laid down in the FABEC performance plan, for en route Air Traffic Flow Management (ATFM) delay has been assessed, in accordance with the principle laid down in point 4 of Annex IV to Implementing Regulation (EU) No 390/2013, by using the respective FAB reference values for capacity that, when applied, ensure at Union level that the Union-wide performance target is met, calculated by the Network Manager and set out in the Network Operations Plan (2014-2018/2019) in its most recent version of June 2014 (‘Network Operations Plan’). That assessment has demonstrated that those targets are not in conformity with the respective reference values and therefore not consistent with the relevant Union-wide performance target.

  • celex=32013R0390