Recital 10, Decision_act (EU) 2015/347

In forcesince 2 Mar 2015

As regard France, its targets are based on a planned reduction of its en route determined unit costs over the second reference period by only 0,7 % per year on average. This is significantly below the targeted reduction of the average Union-wide en route determined unit costs over the second reference period (– 3,3 % per year). Also over the combined period of the first and the second reference period the planned en route determined unit costs do not decrease in line with the Union-wide trend (– 0,2 %, compared to – 1,7 %). In addition, the targets are based on planned en route determined costs at the start of the second reference period that are 6,2 % above the actual en route costs reported in the year 2013. As a result, the improvement in cost-efficiency realised in the first reference period has not been taken adequately into account when setting the targets for the second reference period. While the target for 2019 is based on planned en route determined unit costs that are slightly below (– 2,8 %) the average en route determined unit costs of the Member States having a similar operational and economic environment to the one of France, they are around 23 % above the Union-wide performance target in 2019.