Art. 41 Commission Implementing Regulation (EU) No 809/2014 of 17 July 2014 laying down rules fo…

Control report

In forcesince 1 Nov 2019cited 6×
1.

Every on-the-spot check under this Section shall be the subject of a control report which makes it possible to review the details of the checks carried out and to draw conclusions on the compliance with the eligibility criteria, commitments and other obligations. The report shall indicate in particular:

(a)

the aid schemes or support measures, the aid applications or payment claims checked;

(b)

the persons present;

(c)

the agricultural parcels checked, the agricultural parcels measured including, where applicable, the result of the measurements per measured agricultural parcel and the measuring methods used;

(d)

where applicable, the results of the measurement of non-agricultural land for which support under rural development measures is being claimed and the measuring methods used;

(e)

whether notice of the check was given to the beneficiary and, if so, the period of prior notice;

(f)

indications of any specific control measures to be carried out in the context of individual aid schemes or support schemes;

(g)

indication of any further control measures carried out;

(h)

indication of any non-compliance found that could require cross-notification in view of other aid schemes, support measures and/or cross-compliance;

(i)

indication of any non-compliance found that could require follow-up during the following years.

Where checks by monitoring are carried out in accordance with Article 40a, points (b) to (e) of the first subparagraph shall not apply. The control report shall indicate the results of the checks by monitoring at parcel level.

2.

The beneficiary shall be given the opportunity to sign the report during the check to attest his presence at the check and to add observations. Where Member States make use of a control report established by electronic means during the check, the competent authority shall provide for the possibility of an electronic signature by the beneficiary or the control report shall be sent without delay to the beneficiary giving him the opportunity to sign the report and to add any observations. Where any non-compliance is found the beneficiary shall receive a copy of the control report.

By way of derogation from the first subparagraph, where the Member State uses the option to introduce collective claims, the Member State may decide not to give the collective the opportunity to sign the control report if no non-compliance is revealed during the check. If any non-compliance is revealed as a consequence of such checks, the opportunity to sign the report shall be given before the competent authority draws its conclusions from the findings with regard to any resulting reductions, refusals, withdrawals or penalties.

Where the on-the-spot check is carried out by means of remote sensing in accordance with Article 40 or by means of monitoring in accordance with Article 40a, the Member States may decide not to give the beneficiary the opportunity to sign the control report if no non-compliance is revealed during the check by remote-sensing or by monitoring. If any non-compliance is revealed as a consequence of such checks or by monitoring, the opportunity to sign the report shall be given before the competent authority draws its conclusions from the findings with regard to any resulting reductions, refusals, withdrawals or administrative penalties. Where checks by monitoring are applied, this obligation shall be considered fulfilled if beneficiaries are notified of non-compliances through the tools set up to communicate with beneficiaries in accordance with point (d) of Article 40a(1) and beneficiaries are given the opportunity to contest the non-compliances before the competent authority draws its conclusions from the findings with regard to any resulting reductions, refusals, withdrawals or administrative penalties.

  • Arrêt du Tribunal (première chambre) du 9 septembre 2020. République hellénique contre Commission européenne.Decision

    Il s’ensuit que, pour l’ensemble de ces constats, la Commission a considéré que les contrôles sur place mis en œuvre par les autorités grecques en application des articles 37 à 41 du règlement n o 809/2014 présentaient …

    9 Sep 2020 · 62019TJ0046

  • Arrêt du Tribunal (dixième chambre) du 20 novembre 2024. Royaume d'Espagne contre Commission européenne.Decision

    En ce qui concerne l’absence de l’indication de la liste des parcelles inspectées, le Royaume d’Espagne indique que de telles listes avaient été incluses dans les rapports de contrôle de l’admissibilité des aides liées à la …

    20 Nov 2024 · 62022TJ0508

  • Judgment of the Court (Ninth Chamber) of 23 October 2025. Кanevi Komers DS EOOD v Zamestnik izpalnitelen direktor na Darzhaven fond „ZemedelDecision

    … на състезателност член 59, параграф 3 от Регламент № 1306/2013 и член 41 от Регламент за изпълнение № 809/2014 предвиждат задължение за …

    23 Oct 2025 · 62024CJ0267

  • Arrêt du Tribunal (quatrième chambre) du 9 mars 2022. République italienne contre Commission européenne.Decision

    Un deuxième groupe de manquements concernait le non-respect du nombre et de la qualité des contrôles sur place effectués par les autorités italiennes en violation des articles 30 à 41 du règlement d’exécution n o 809/2014.

    9 Mar 2022 · 62020TJ0010

  • Sentencia del Tribunal General (Sala Décima) de 20 de noviembre de 2024. Reino de España contra Comisión Europea.Decision

    20 Nov 2024 · 62022TJ0508

  • Arrêt du Tribunal (dixième chambre) du 10 avril 2024. République portugaise contre Commission européenne.Decision

    Dans le cadre du troisième contrôle clé, la DG « Agriculture et développement rural » a relevé une violation des articles 43 à 46 du règlement n o 1307/2013 ainsi que des articles 37 à 41 du règlement d’exécution (UE) n o …

    10 Apr 2024 · 62022TJ0512