Aid for maritime ports shall be compatible with the internal market within the meaning of Article 107(3) of the Treaty and shall be exempted from the notification requirement of Article 108(3) of the Treaty, provided that the conditions laid down in this Article and in Chapter I are fulfilled.
Aid under this Article shall not be granted for the construction, installation, or upgrade of refuelling infrastructure supplying vessels with fossil-based fuels, such as diesel, natural gas, in gaseous form (compressed natural gas (CNG)) and liquefied form (liquefied natural gas (LNG)), and liquefied petroleum gas (LPG).
The eligible costs shall be the costs, including planning costs, of:
investments for the construction, replacement or upgrade of port infrastructures;
investments for the construction, replacement or upgrade of access infrastructure;
dredging.
For aid for recharging and refuelling infrastructure supplying electricity, hydrogen, ammonia and methanol, the eligible costs shall be the costs of the construction, installation, upgrade or extension of recharging or refuelling infrastructure. Those costs may include the costs of the recharging or refuelling infrastructure itself and related technical equipment, including fixed, mobile or floating facilities, the installation of, or upgrades to, electrical or other components, including electrical cables and power transformers, required for connecting the recharging or refuelling infrastructure to the grid or to a local electricity or hydrogen production or storage unit, as well as civil engineering works, land or road adaptations, installation costs and costs for obtaining related permits.
The eligible costs may also cover the investment costs of on-site production of renewable electricity or renewable hydrogen and the investment costs of storage units for storing renewable electricity or hydrogen. The nominal production capacity of the on-site renewable electricity or renewable hydrogen production installation shall not exceed the maximum rated output or refuelling capacity of the recharging or refuelling infrastructure to which it is connected.
Costs relating to non-transport related activities, including industrial production facilities active in a port, offices or shops, as well as for port superstructures shall not be eligible costs.
The aid amount shall not exceed the difference between the eligible costs and the operating profit of the investment or dredging. The operating profit shall be deducted from the eligible costs ex ante, on the basis of reasonable projections, or through a claw-back mechanism.
The aid intensity per investment referred to in paragraph 2, point (a), shall not exceed:
100 % of the eligible costs where total eligible costs of the project are up to EUR 22 million;
80 % of the eligible costs where total eligible costs of the project are above EUR 22 million and up to EUR 55 million;
60 % of the eligible costs where total eligible costs of the project are above EUR 55 million and up to the amount laid down in Article 4(1), point (ee).
The aid intensity shall not exceed 100 % of the eligible costs determined in paragraph 2, points (b) and (c), up to the amount laid down in Article 4(1), point (ee).
The aid intensities laid down in points (b) and (c) of the first subparagraph of paragraph 5 may be increased by 10 percentage points for investments located in assisted areas fulfilling the conditions of point (a) of Article 107(3) of the Treaty and by 5 percentage points for investments located in assisted areas fulfilling the conditions of point (c) of Article 107(3) of the Treaty.
Any concession or other entrustment to a third party to construct, upgrade, operate or rent aided port infrastructure shall be assigned on a competitive, transparent, non-discriminatory and unconditional basis.
The aided port infrastructure shall be made available to interested users on an equal and non-discriminatory basis on market terms.
When aid is granted for the construction, installation or upgrade of a refuelling infrastructure supplying hydrogen, the beneficiary shall give a commitment that by 31 December 2035 at the latest the aided refuelling infrastructure will supply solely renewable hydrogen. When aid is granted for the construction, installation or upgrade of a refuelling infrastructure supplying ammonia or methanol, the beneficiary shall give a commitment that by 31 December 2035 at the latest the aided refuelling infrastructure will supply solely ammonia or methanol the energy content of which is derived from renewable sources other than biomass and that have been produced in accordance with the methodologies set out for renewable liquid and gaseous transport fuels of non-biological origin in Directive (EU) 2018/2001 and its implementing or delegated acts.
For aid not exceeding EUR 5.5 million, the maximum amount of aid may be set at 80 % of eligible costs, as an alternative to application of the method referred to in paragraphs 4, 5 and 6.