Recital 12, Decision_act (EU) 2014/132

In forcesince 11 Mar 2014

The expected improvement in cost-efficiency for the second reference period should be measured against determined costs for 2014 of EUR 6,242 million [Including the cost for Croatia, which did not participate in the performance scheme during the first reference period, and adjustments for all Member States to take account of the anticipated deduction for exempted VFR flights.] in EUR2009. On the basis of the most recent traffic assumptions for 2014 [107439000en route service units (source: STATFOR, low case forecast, September 2013).], the baseline value for the determined unit cost should be EUR 58,09 in EUR2009. Thus, the cost-efficiency target should provide for a reduction in determined unit costs by 3,3 % per year over the second reference period. The baseline value of EUR 58,09 in EUR2009 is higher than the Union-wide performance target of EUR 53,92 in EUR2009 set for 2014, because the projected traffic volume for 2014 is lower than originally assumed in Commission Decision 2011/121/EU [Commission Decision 2011/121/EU of 21 February 2011 setting the European Union-wide performance targets and alert thresholds for the provision of air navigation services for the years 2012 to 2014 (OJ L 48, 23.2.2011, p. 16).].