The revised EQS for existing priority substances should be taken into account for the first time in river basin management plans covering the period 2015 to 2021. The newly identified priority substances and their EQS should be taken into account in the establishment of supplementary monitoring programmes and in preliminary programmes of measures to be submitted by the end of 2018. With the aim of achieving good surface water chemical status, the revised EQS for existing priority substances should be met by the end of 2021 and the EQS for newly identified priority substances by the end of 2027, without prejudice to Article 4(4) to (9) of Directive 2000/60/EC, which includes inter alia provisions for extending the deadline for achieving good surface water chemical status or achieving less stringent environmental objectives for specific bodies of water on the grounds of disproportionate cost and/or socio-economic need, provided that no further deterioration occurs in the status of the affected bodies of water. The determination of surface water chemical status by the 2015 deadline laid down in Article 4 of Directive 2000/60/EC should be based, therefore, only on the substances and EQS set out in Directive 2008/105/EC in the version in force on 13 January 2009 unless those EQS are stricter than the revised EQS under this Directive, in which case the latter should be applied.
Recital 9, Directive (EU) 2013/39
In forcesince 12 Aug 2013