The following were the major comments concerning the annual priority list regarding electricity network rules received during the public consultation:
Several stakeholders were concerned about possible inconsistencies between network codes. Some proposed to develop only one network code in line with one framework guideline and some emphasised that at least some network codes need to be developed together such as the network codes on generator connection and demand connection, the network codes on grid connection and system operation, the network code on connection and congestion management and the ‘governance’ comitology guideline.
Several stakeholders support the development of rules regarding harmonised transmission tariff structures and/or investment incentives. ENTSO-E was of the opinion that the issue of tariff structures and the issue of investment incentives are largely unrelated and recommended therefore addressing them independently while giving priority to rules regarding investment incentives.
ENTSO-E expressed the view that rules for longer-term (forward) capacity allocation and rules on High-voltage direct current transmission system connection need to be included into the annual priority list for 2013.