91 7. ASSESSMENT OF THE MEASURES › 7.1. Competence of the Commission, Decision_act (EU) 2010/174

In forcesince 10 Mar 2009

On the basis of the information provided by the Polish authorities, the Commission has been able to determine that the measures listed in Table 2 above were granted before accession and are not applicable thereafter. The Commission is not therefore competent to assess their compatibility with the common market. However, they have to be taken into account for determining the compatibility of aid measures granted or to be granted after accession. They amount to PLN 147 million (EUR 35 million) [The amount of PLN 147 million includes the loans granted to HSW by the ARP before accession amounting to PLN 75 million. These two loans were in 2007 converted into equity and are, thus, also featured as a debt-to-equity swap in Table 4.].