Recital 9, Directive (EU) 2009/126

In force

Existing service stations may need to adapt existing infrastructure and it is preferable to install vapour recovery equipment when they undergo major refurbishment of the fuelling system (that is to say, significant alteration or renewal of the station infrastructure, particularly tanks and pipes), since this significantly reduces the cost of the necessary adaptations. However, larger existing stations are better able to adapt and should install petrol vapour recovery earlier, given that they make a greater contribution to emissions. New service stations can integrate petrol vapour recovery equipment during the design and construction of the service station and can therefore install such equipment immediately.