Directive 85/337/EEC is hereby amended as follows:
Annex I shall be amended as follows:
point 16 shall be replaced by the following:
‘16. Pipelines with a diameter of more than 800 mm and a length of more than 40 km:
for the transport of gas, oil, chemicals, and,
for the transport of carbon dioxide (CO2) streams for the purposes of geological storage, including associated booster stations.’;
the following points shall be added:
‘23. Storage sites pursuant to Directive 2009/31/EC of the European Parliament and of the Council of 23 April 2009 on the geological storage of carbon dioxide [OJ L 140, 5.6.2009, p. 114.’;].
Installations for the capture of CO2 streams for the purposes of geological storage pursuant to Directive 2009/31/EC from installations covered by this Annex, or where the total yearly capture of CO2 is 1,5 megatonnes or more.
Annex II shall be amended as follows:
the following point shall be added to point 3:
‘(j) Installations for the capture of CO2 streams for the purposes of geological storage pursuant to Directive 2009/31/EC from installations not covered by Annex I to this Directive.’;
point (i) of point 10 shall be replaced by the following:
‘(i) Oil and gas pipeline installations and pipelines for the transport of CO2 streams for the purposes of geological storage (projects not included in Annex I).’