Directive 2003/87/EC is hereby amended as follows:
The following paragraphs shall be added to Article 1:
‘This Directive also provides for the reductions of greenhouse gas emissions to be increased so as to contribute to the levels of reductions that are considered scientifically necessary to avoid dangerous climate change.
This Directive also lays down provisions for assessing and implementing a stricter Community reduction commitment exceeding 20 %, to be applied upon the approval by the Community of an international agreement on climate change leading to greenhouse gas emission reductions exceeding those required in Article 9, as reflected in the 30 % commitment endorsed by the European Council of March 2007.’;
Article 3 shall be amended as follows:
point (c) shall be replaced by the following:
‘(c) “greenhouse gases” means the gases listed in Annex II and other gaseous constituents of the atmosphere, both natural and anthropogenic, that absorb and re-emit infrared radiation;’;
point (h) shall be replaced by the following:
‘(h) “new entrant” means:
any installation carrying out one or more of the activities indicated in Annex I, which has obtained a greenhouse gas emissions permit for the first time after 30 June 2011,
any installation carrying out an activity which is included in the Community scheme pursuant to Article 24(1) or (2) for the first time, or
any installation carrying out one or more of the activities indicated in Annex I or an activity which is included in the Community scheme pursuant to Article 24(1) or (2), which has had a significant extension after 30 June 2011, only in so far as this extension is concerned.’;
The following points shall be added:
‘(t) “combustion” means any oxidation of fuels, regardless of the way in which the heat, electrical or mechanical energy produced by this process is used, and any other directly associated activities, including waste gas scrubbing;
“electricity generator” means an installation that, on or after 1 January 2005, has produced electricity for sale to third parties, and in which no activity listed in Annex I is carried out other than the “combustion of fuels”.’;
In Article 3c(2), the word ‘Article 11(2)’ shall be replaced by ‘Article 13(1)’;
In Article 3g, the words ‘the guidelines adopted pursuant to Article 14’ shall be replaced by ‘the regulation referred to in Article 14’;
Article 4 shall be replaced by the following:
Member States shall ensure that, from 1 January 2005, no installation carries out any activity listed in Annex I resulting in emissions specified in relation to that activity unless its operator holds a permit issued by a competent authority in accordance with Articles 5 and 6, or the installation is excluded from the Community scheme pursuant to Article 27. This shall also apply to installations opted in under Article 24.’;
Article 5(d) shall be replaced by the following:
‘(d) the measures planned to monitor and report emissions in accordance with the regulation referred to in Article 14.’;
Article 6 shall be amended as follows:
In paragraph 1, the following subparagraph shall be added:
‘The competent authority shall, at least every five years, review the greenhouse gas emissions permit and make any amendments as are appropriate.’;
In paragraph 2, point (c) shall be replaced by the following:
‘(c) a monitoring plan that fulfils the requirements under the regulation referred to in Article 14. Member States may allow operators to update monitoring plans without changing the permit. Operators shall submit any updated monitoring plans to the competent authority for approval.’;
Article 7 shall be replaced by the following:
The operator shall inform the competent authority of any planned changes to the nature or functioning of the installation, or any extension or significant reduction of its capacity, which may require updating the greenhouse gas emissions permit. Where appropriate, the competent authority shall update the permit. Where there is a change in the identity of the installation's operator, the competent authority shall update the permit to include the name and address of the new operator.’;
Article 9 shall be replaced by the following:
The Community-wide quantity of allowances issued each year starting in 2013 shall decrease in a linear manner beginning from the mid-point of the period from 2008 to 2012. The quantity shall decrease by a linear factor of 1,74 % compared to the average annual total quantity of allowances issued by Member States in accordance with the Commission Decisions on their national allocation plans for the period from 2008 to 2012.
The Commission shall, by 30 June 2010, publish the absolute Community-wide quantity of allowances for 2013, based on the total quantities of allowances issued or to be issued by the Member States in accordance with the Commission Decisions on their national allocation plans for the period from 2008 to 2012.
The Commission shall review the linear factor and submit a proposal, where appropriate, to the European Parliament and to the Council as from 2020, with a view to the adoption of a decision by 2025.’;
The following Article shall be inserted:
In respect of installations that were included in the Community scheme during the period from 2008 to 2012 pursuant to Article 24(1), the quantity of allowances to be issued from 1 January 2013 shall be adjusted to reflect the average annual quantity of allowances issued in respect of those installations during the period of their inclusion, adjusted by the linear factor referred to in Article 9.
In respect of installations carrying out activities listed in Annex I, which are only included in the Community scheme from 2013 onwards, Member States shall ensure that the operators of such installations submit to the relevant competent authority duly substantiated and independently verified emissions data in order for them to be taken into account for the adjustment of the Community-wide quantity of allowances to be issued.
Any such data shall be submitted, by 30 April 2010, to the relevant competent authority in accordance with the provisions adopted pursuant to Article 14(1).
If the data submitted are duly substantiated, the competent authority shall notify the Commission thereof by 30 June 2010 and the quantity of allowances to be issued, adjusted by the linear factor referred to in Article 9, shall be adjusted accordingly. In the case of installations emitting greenhouse gases other than CO2, the competent authority may notify a lower amount of emissions according to the emission reduction potential of those installations.
The Commission shall publish the adjusted quantities referred to in paragraphs 1 and 2 by 30 September 2010.
In respect of installations which are excluded from the Community scheme in accordance with Article 27, the Community-wide quantity of allowances to be issued from 1 January 2013 shall be adjusted downwards to reflect the average annual verified emissions of those installations in the period from 2008 to 2010, adjusted by the linear factor referred to in Article 9.’;
Article 10 shall be replaced by the following:
From 2013 onwards, Member States shall auction all allowances which are not allocated free of charge in accordance with Article 10a and 10c. By 31 December 2010, the Commission shall determine and publish the estimated amount of allowances to be auctioned.
The total quantity of allowances to be auctioned by each Member State shall be composed as follows:
88 % of the total quantity of allowances to be auctioned being distributed amongst Member States in shares that are identical to the share of verified emissions under the Community scheme for 2005 or the average of the period from 2005 to 2007, whichever one is the highest, of the Member State concerned;
10 % of the total quantity of allowances to be auctioned being distributed amongst certain Member States for the purpose of solidarity and growth within the Community, thereby increasing the amount of allowances that those Member States auction under point (a) by the percentages specified in Annex IIa; and
2 % of the total quantity of allowances to be auctioned being distributed amongst Member States the greenhouse gas emissions of which were, in 2005, at least 20 % below their emissions in the base year applicable to them under the Kyoto Protocol. The distribution of this percentage amongst the Member States concerned is set out in Annex IIb.
For the purposes of point (a), in respect of Member States which did not participate in the Community scheme in 2005, their share shall be calculated using their verified emissions under the Community scheme in 2007.
If necessary, the percentages referred to in points (b) and (c) shall be adapted in a proportional manner to ensure that the distribution is 10 % and 2 % respectively.
Member States shall determine the use of revenues generated from the auctioning of allowances. At least 50 % of the revenues generated from the auctioning of allowances referred to in paragraph 2, including all revenues from the auctioning referred to in paragraph 2, points (b) and (c), or the equivalent in financial value of these revenues, should be used for one or more of the following:
to reduce greenhouse gas emissions, including by contributing to the Global Energy Efficiency and Renewable Energy Fund and to the Adaptation Fund as made operational by the Poznan Conference on Climate Change (COP 14 and COP/MOP 4), to adapt to the impacts of climate change and to fund research and development as well as demonstration projects for reducing emissions and for adaptation to climate change, including participation in initiatives within the framework of the European Strategic Energy Technology Plan and the European Technology Platforms;
to develop renewable energies to meet the commitment of the Community to using 20 % renewable energies by 2020, as well as to develop other technologies contributing to the transition to a safe and sustainable low-carbon economy and to help meet the commitment of the Community to increase energy efficiency by 20 % by 2020;
measures to avoid deforestation and increase afforestation and reforestation in developing countries that have ratified the international agreement on climate change, to transfer technologies and to facilitate adaptation to the adverse effects of climate change in these countries;
forestry sequestration in the Community;
the environmentally safe capture and geological storage of CO2, in particular from solid fossil fuel power stations and a range of industrial sectors and subsectors, including in third countries;
to encourage a shift to low-emission and public forms of transport;
to finance research and development in energy efficiency and clean technologies in the sectors covered by this Directive;
measures intended to increase energy efficiency and insulation or to provide financial support in order to address social aspects in lower and middle income households;
to cover administrative expenses of the management of the Community scheme.
Member States shall be deemed to have fulfilled the provisions of this paragraph if they have in place and implement fiscal or financial support policies, including in particular in developing countries, or domestic regulatory policies, which leverage financial support, established for the purposes set out in the first subparagraph and which have a value equivalent to at least 50 % of the revenues generated from the auctioning of allowances referred to in paragraph 2, including all revenues from the auctioning referred to in paragraph 2, points (b) and (c).
Member States shall inform the Commission as to the use of revenues and the actions taken pursuant to this paragraph in their reports submitted under Decision No 280/2004/EC.
By 30 June 2010, the Commission shall adopt a regulation on timing, administration and other aspects of auctioning to ensure that it is conducted in an open, transparent, harmonised and non-discriminatory manner. To this end, the process should be predictable, in particular as regards the timing and sequencing of auctions and the estimated volumes of allowances to be made available.
Auctions shall be designed to ensure that:
operators, and in particular any SMEs covered by the Community scheme, have full, fair and equitable access;
all participants have access to the same information at the same time and that participants do not undermine the operation of the auction;
the organisation and participation in auctions is cost-efficient and undue administrative costs are avoided; and
access to allowances is granted for small emitters.
That measure, designed to amend non-essential elements of this Directive by supplementing it, shall be adopted in accordance with the regulatory procedure with scrutiny referred to in Article 23(3).
Member States shall report on the proper implementation of the auctioning rules for each auction, in particular with respect to fair and open access, transparency, price formation and technical and operational aspects. These reports shall be submitted within one month of the auction concerned and shall be published on the Commission's website.
The Commission shall monitor the functioning of the European carbon market. Each year, it shall submit a report to the European Parliament and to the Council on the functioning of the carbon market including the implementation of the auctions, liquidity and the volumes traded. If necessary, Member States shall ensure that any relevant information is submitted to the Commission at least two months before the Commission adopts the report.’;
The following Articles shall be inserted:
By 31 December 2010, the Commission shall adopt Community-wide and fully-harmonised implementing measures for the allocation of the allowances referred to in paragraphs 4, 5, 7 and 12, including any necessary provisions for a harmonised application of paragraph 19.
Those measures, designed to amend non-essential elements of this Directive by supplementing it, shall be adopted in accordance with the regulatory procedure with scrutiny referred to in Article 23(3).
The measures referred to in the first subparagraph shall, to the extent feasible, determine Community-wide ex-ante benchmarks so as to ensure that allocation takes place in a manner that provides incentives for reductions in greenhouse gas emissions and energy efficient techniques, by taking account of the most efficient techniques, substitutes, alternative production processes, high efficiency cogeneration, efficient energy recovery of waste gases, use of biomass and capture and storage of CO2, where such facilities are available, and shall not provide incentives to increase emissions. No free allocation shall be made in respect of any electricity production, except for cases falling within Article 10c and electricity produced from waste gases.
For each sector and subsector, in principle, the benchmark shall be calculated for products rather than for inputs, in order to maximise greenhouse gas emissions reductions and energy efficiency savings throughout each production process of the sector or the subsector concerned.
In defining the principles for setting ex-ante benchmarks in individual sectors and subsectors, the Commission shall consult the relevant stakeholders, including the sectors and subsectors concerned.
The Commission shall, upon the approval by the Community of an international agreement on climate change leading to mandatory reductions of greenhouse gas emissions comparable to those of the Community, review those measures to provide that free allocation is only to take place where this is fully justified in the light of that agreement.
In defining the principles for setting ex-ante benchmarks in individual sectors or subsectors, the starting point shall be the average performance of the 10 % most efficient installations in a sector or subsector in the Community in the years 2007-2008. The Commission shall consult the relevant stakeholders, including the sectors and subsectors concerned.
The regulations pursuant to Articles 14 and 15 shall provide for harmonised rules on monitoring, reporting and verification of production-related greenhouse gas emissions with a view to determining the ex-ante benchmarks.
Subject to paragraphs 4 and 8, and notwithstanding Article 10c, no free allocation shall be given to electricity generators, to installations for the capture of CO2, to pipelines for transport of CO2 or to CO2 storage sites.
Free allocation shall be given to district heating as well as to high efficiency cogeneration, as defined by Directive 2004/8/EC, for economically justifiable demand, in respect of the production of heating or cooling. In each year subsequent to 2013, the total allocation to such installations in respect of the production of that heat shall be adjusted by the linear factor referred to in Article 9.
The maximum annual amount of allowances that is the basis for calculating allocations to installations which are not covered by paragraph 3 and are not new entrants shall not exceed the sum of:
the annual Community-wide total quantity, as determined pursuant to Article 9, multiplied by the share of emissions from installations not covered by paragraph 3 in the total average verified emissions, in the period from 2005 to 2007, from installations covered by the Community scheme in the period from 2008 to 2012; and
the total average annual verified emissions from installations in the period from 2005 to 2007 which are only included in the Community scheme from 2013 onwards and are not covered by paragraph 3, adjusted by the linear factor, as referred to in Article 9.
A uniform cross-sectoral correction factor shall be applied if necessary.
Member States may also adopt financial measures in favour of sectors or subsectors determined to be exposed to a significant risk of carbon leakage due to costs relating to greenhouse gas emissions passed on in electricity prices, in order to compensate for those costs and where such financial measures are in accordance with state aid rules applicable and to be adopted in this area.
Those measures shall be based on ex-ante benchmarks of the indirect emissions of CO2 per unit of production. The ex-ante benchmarks shall be calculated for a given sector or subsector as the product of the electricity consumption per unit of production corresponding to the most efficient available technologies and of the CO2 emissions of the relevant European electricity production mix.
Five percent of the Community-wide quantity of allowances determined in accordance with Articles 9 and 9a over the period from 2013 to 2020 shall be set aside for new entrants, as the maximum that may be allocated to new entrants in accordance with the rules adopted pursuant to paragraph 1 of this Article. Allowances in this Community-wide reserve that are neither allocated to new entrants nor used pursuant to paragraph 8, 9 or 10 of this Article over the period from 2013 to 2020 shall be auctioned by the Member States, taking into account the level to which installations in Member States have benefited from this reserve, in accordance with Article 10(2) and, for detailed arrangements and timing, Article 10(4), and the relevant implementing provisions.
Allocations shall be adjusted by the linear factor referred to in Article 9.
No free allocation shall be made in respect of any electricity production by new entrants.
By 31 December 2010, the Commission shall adopt harmonised rules for the application of the definition of “new entrant”, in particular in relation to the definition of “significant extensions”.
Those measures, designed to amend non-essential elements of this Directive by supplementing it, shall be adopted in accordance with the regulatory procedure with scrutiny referred to in Article 23(3).
Up to 300 million allowances in the new entrants' reserve shall be available until 31 December 2015 to help stimulate the construction and operation of up to 12 commercial demonstration projects that aim at the environmentally safe capture and geological storage (CCS) of CO2 as well as demonstration projects of innovative renewable energy technologies, in the territory of the Union.
The allowances shall be made available for support for demonstration projects that provide for the development, in geographically balanced locations, of a wide range of CCS and innovative renewable energy technologies that are not yet commercially viable. Their award shall be dependent upon the verified avoidance of CO2 emissions.
Projects shall be selected on the basis of objective and transparent criteria that include requirements for knowledge-sharing. Those criteria and the measures shall be adopted in accordance with the regulatory procedure with scrutiny referred to in Article 23(3), and shall be made available to the public.
Allowances shall be set aside for the projects that meet the criteria referred to in the third subparagraph. Support for these projects shall be given via Member States and shall be complementary to substantial co-financing by the operator of the installation. They could also be co-financed by the Member State concerned, as well as by other instruments. No project shall receive support via the mechanism under this paragraph that exceeds 15 % of the total number of allowances available for this purpose. These allowances shall be taken into account under paragraph 7.
Lithuania, which, pursuant to Article 1 of Protocol No 4 on the Ignalina nuclear power plant in Lithuania, annexed to the 2003 Act of Accession, has committed to the closure of unit 2 of the Ignalina Nuclear Power Plant by 31 December 2009, may, if the total verified emissions of Lithuania in the period from 2013 to 2015 within the Community scheme exceed the sum of the free allowances issued to installations in Lithuania for electricity production emissions in that period and three-eighths of the allowances to be auctioned by Lithuania for the period from 2013 to 2020, claim allowances from the new entrants reserve for auctioning in accordance with the regulation referred to in Article 10(4). The maximum amount of such allowances shall be equivalent to the excess emissions in that period to the extent that this excess is due to increased emissions from electricity generation, minus any quantity by which allocations in that Member State in the period from 2008 to 2012 exceeded verified emissions within the Community scheme in Lithuania during that period. Any such allowances shall be taken into account under paragraph 7.