Recital 3, Decision_act (EU) 2008/323

In forcesince 1 Apr 2008

That specific control and inspection programme should be set up for the period from 1 April to 31 December 2008. The results obtained by the application of the specific control and inspection programme should be periodically evaluated in cooperation with the Member States concerned.