The Commission also notes that regarding the BGB case, the Commission conducted an in-depth analysis on the probability that the guaranteed risks would materialise. Because some risks were very unlikely, the reasonable scenario (economic value) assessed by the Commission lead to an aid element in the guarantee below the nominal value of the latter. Regarding the CWP case, the guarantees referred to by Austria enabled CWP to obtain loans on better financial terms than those normally available on the financial markets. This is not the situation encountered in the present case. However, after having analysed the specific situation of CWP, the Commission concluded that the market price of the guarantees at stake would have been the reference interest rate plus 400 basis points. In the BAWAG-PSK case, the Commission has also conducted a specific in-depth economic analysis of the occurrence of each aspect of the three possible scenarios in order to figure out the aid value in the State guarantee.
162 VII. ASSESSMENT OF THE AID MEASURE › Aid amount › Analyses put forward by Austria, Decision_act (EU) 2008/263
In forcesince 27 Jun 2007