Name of contact person:
Official title of contact person:
Name and department of organisation:
Address:
International telephone number:
International fax number:
E-mail:
Questions 2.1 and 2.2 are to be answered in the report due by 30 June 2007 and in subsequent reports if changes were made during the reporting period.
2.1. Please state the name and the abbreviation of the competent authorities which are involved in the implementation of the emissions trading scheme in your country.
In answering this question, use the table below. Add further rows if necessary.
Name | Abbreviation | Contact details
2.2. Please indicate which competent authority is responsible for each of the tasks listed in the table below using their abbreviations.
Please indicate the abbreviation of the competent authority which is in charge of the following tasks:
Issuance of permits |
Allocation of allowances |
Issuance of allowances |
Validation of monitoring methodology |
Receiving and supervising verified emission reports |
Accreditation of verifiers |
Registry |
Compliance and enforcement |
Issuance of ERU as a host country |
Approval of the use of CERs & ERUs for compliance |
Administration of new entrants reserve |
Information to the public |
Auctioning |
Administration of opt-ins |
Administration of pooling |
Other (please specify): |
3.1. How many of the combustion installations have a rated thermal input that exceeds 20 MW but is below 50 MW on 31 December of the reporting year? In total, how many CO2 equivalents were emitted by these installations in the reporting period?
In answering this question, use the table below.
Number | Share in total number of installations or emissions
Number of installations with a rated thermal input that exceeds 20 MW but is below 50 MW | |
CO2 equivalents emitted by those installations | |
3.2. What changes occurred during the reporting period in comparison with the national allocation plan table (NAP Table) as entered into the Community Independent Transaction Log on 1 January of the reporting year (new entrants, closures, installations falling below the capacity thresholds)?
In answering this question, use Table 1 of Part 2 of this Annex.
3.3. Did the competent authority receive any application(s) during the reporting period from operators who wish to form a pool pursuant to Article 28 of Directive 2003/87/EC (ET Directive)? If yes, to which activity listed in Annex I to Directive 2003/87/EC (hereinafter — “Annex I activity”) did the application refer to and was the pool formed?
In answering this question, use the table below.
[If an installation carries out more than one activity, please only count the installation once under its main Annex I activity.]
Main Annex I activity | Number of applications received | Number of pools formed
Energy activities
E1 | Combustion installations with a rated thermal input exceeding 20 MW (except hazardous or municipal waste installations) | |
E2 | Mineral oil refineries | |
E3 | Coke ovens | |
Production and processing of ferrous metals
F1 | Metal ore (including sulphide ore) roasting or sintering installations | |
F2 | Installations for the production of pig iron or steel (primary or secondary fusion) including continuous casting, with a capacity exceeding 2.5 tonnes per hour | |
Mineral industry
M1 | Installations for the production of cement clinker in rotary kilns with a production capacity exceeding 500 tonnes per day or lime in rotary kilns with a production capacity exceeding 50 tonnes per day or in other furnaces with a production capacity exceeding 50 tonnes per day | |
M2 | Installations for the manufacture of glass including glass fibre with a melting capacity exceeding 20 tonnes per day | |
M3 | Installations for the manufacture of ceramic products by firing, in particular roofing tiles, bricks, refractory bricks, tiles, stoneware or porcelain, with a production capacity exceeding 75 tonnes per day, and/or with a kiln capacity exceeding 4 m3 and with a setting density per kiln exceeding 300 kg/m3 | |
Other activitiesIndustrial plants for the production of
O1 |
pulp from timber or other fibrous materials
O2 |
paper and board with a production capacity exceeding 20 tonnes per day
3.4. Is there any other relevant information concerning the coverage of installations and activities in your country? If so, please specify.
Questions 4.1 to 4.4 are to be answered in the report due by 30 June 2007 and in subsequent reports if changes were made during the reporting period.
4.1. What measures have been taken to ensure that operators comply with the requirements of their greenhouse gas emissions permits?
Note: Fines or penalties which might be imposed in case of infringements must not be reported here but under section 11.
In answering this question, use the table below. Add further rows if necessary.
Which of the following measures are applied in your country (add explanatory text if necessary)?
The account will be blocked in case of irregularities | Yes/No
Selling will be prohibited in case of irregularities | Yes/No
Withdrawal of permit; suspension of the installation | Yes/No
Spot or routine checks or inspections by the administration | Yes/No
Conservative emission estimates in case of missing emission reports | Yes/No
Verification bodies check compliance with the conditions of the permit | Yes/No
Regular meetings with industry & associations to discuss relevant issues | Yes/No
Provision of specific reporting formats and guidance | Yes/No
Naming and shaming of non-compliant operators | Yes/No
Other (please specify): |
4.2. Where more than one competent authority is involved, how does national legislation ensure that the conditions of and the procedures for the issuance of permits are fully coordinated? How does this coordination work in practice?
In answering this question, use the table below. Add further rows if necessary.
Which of the following statements applies to your country (add explanatory text if necessary)?
More than one competent authority | Yes/No
If yes, please answer the following questions:
Cooperation explicitly regulated by a law or a regulation | Yes/No
Commission or working group or coordination with regular meetings established | Yes/No
Guidance note for implementation of the national emissions trading law | Yes/No
Interpretation group to clarify ambiguous issues | Yes/No
Coordination of administrative acts by one central authority | Yes/No
Training courses to ensure consistent implementation | Yes/No
Other (please specify): |
4.3. In cases where installations carry out activities listed in Annex I to Council Directive 96/61/EC [OJ L 257, 10.10.1996, p. 26. Directive as last amended by Regulation (EC) No 166/2006 of the European Parliament and of the Council (OJ L 33, 4.2.2006, p. 1).] (IPPC Directive) what measures have been taken to ensure that conditions and procedure for the issue of a greenhouse gas emissions permit are coordinated with those for the permit provided for in that Directive? Have the requirements laid down in Articles 5, 6 and 7 of Directive 2003/87/EC been integrated into the procedures provided for in Directive 96/61/EC? If so, how was this integration performed?
In answering this question, use the table below. Add further rows if necessary.
Which of the following statements applies to your country (add explanatory text if necessary)?
Requirements laid down in Articles 5-7 of Directive 2003/87/EC have been transposed by national legislation | Yes/No
Law which transposes the IPPC Directive does not include emission or concentration limits for CO2 | Yes/No
Integrated permitting procedure under the IPPC Directive and the ET Directive | Yes/No
Separate permits for IPPC and ET Directive | Yes/No
Granting of an IPPC permit requires a valid emissions trading scheme (ETS) permit | Yes/No
Granting of an ETS permit requires a valid IPPC permit | Yes/No
IPPC regulators will check whether ETS permit is necessary and inform ETS regulators | Yes/No
Other (please specify): |
4.4. What are the legislative provisions, procedures and practice concerning updating of permit conditions by the competent authority pursuant to Article 7 of Directive 2003/87/EC?
In answering this question, use the table below. Add further rows if necessary.
Please refer to the legal provision which transposes Article 7 of Directive 2003/87/EC |
Which of the following provisions, procedures and practices apply to your country (add explanatory text if necessary)?
Authorisation for changes in the installation type or operating mode required | Yes/No
Authorisation for changes in the monitoring methodology required | Yes/No
Changes have to be notified in advance | Yes/No
Closures have to be notified immediately | Yes/No
Penalty in case of non-compliance with request to update monitoring methodology | Yes/No
Change of the operator requires an update of permit | Yes/No
Less significant changes are just recorded | Yes/No
Other (please specify): |
4.5. How many permits were updated during the reporting period because of a change in the nature or functioning, or extension, of installations made by operators as specified in Article 7 of Directive 2003/87/EC? Please provide for each category (capacity increase, capacity decrease, change in process type, etc.) how many permits were updated.
In answering this question, use the table below. Add further rows if necessary.
Please state the number of changes in each category:
Total changes |
Revoked |
Surrendered |
Transferred |
Increase of capacity |
Decrease of capacity |
Changes to monitoring and reporting details |
Change in name of installation or operator |
Non-significant amendment |
Notification of changes without update of permit |
Other (please specify): |
4.6. Is there any other relevant information concerning the issue of permits for installations in your country? If so, please specify.
Question 5.1 is to be answered in the report due by 30 June 2007, the first report of each trading period and in subsequent reports if changes were made during the reporting period.
5.1. What legal acts have been adopted in your country in order to implement monitoring and reporting guidelines? Are general derogations from the monitoring and reporting guidelines allowed by the legislation of your country, e.g. for specific fuels or activities? If so, please specify.
5.2. Which tiers were used in the monitoring methodologies for the major emitting installations (cf. Commission Decision 2004/156/EC [OJ L 59, 26.2.2004, p. 1.])?
In answering this question, use Table 2 of Part 2 of this Annex. The information required in Table 2 need only be given for the largest installations covered by the ET Directive which contribute cumulatively to 50 % of the total emissions included in the trading scheme. No information needs to be reported for sources within these installations with annual emissions below 25 kt CO2 eq.
5.3. If tiers below the minimum tiers specified in Table 1 in section 4.2.2.1.4 of Annex I to Decision 2004/156/EC have been accepted in the monitoring methodology, please indicate for each installation for which this situation occurred the coverage of emissions, the activity, the tier category (activity data, net calorific value, emission factor, oxidation factor or conversion factor) and the monitoring approach/tier agreed in the permit.
In answering this question, use Table 3 of Part 2 of this Annex. The information required in Table 3 needs only to be given for installations not reported under question 5.2. General derogations provided for in the national legislation must be reported under question 5.1.
5.4. Which installations temporarily applied different tier methods than those agreed with the competent authority?
In answering this question, use Table 4 of Part 2 of this Annex.
5.5. In how many installations was continuous emissions measurement applied? Please indicate the number of installations per Annex I activity and within each activity per subcategory based on reported annual emissions (less than 50 kt, 50-500 kt and over 500 kt).
In answering this question, use Table 5 of Part 2 of this Annex.
5.6. How much CO2 was transferred from installations? Please indicate the number of tonnes of CO2 transferred pursuant to section 4.2.2.1.2 of Annex I to Decision 2004/156/EC and the number of installations that transferred CO2 for each activity listed in Annex I to Directive 2003/87/EC.
In answering this question, use the table below.
Main Annex I activity | Number of installations | CO2 transferred (kt CO2) | Use of transferred CO2
E1 | | |
E2 | | |
E3 | | |
F1 | | |
F2 | | |
M1 | | |
M2 | | |
M3 | | |
O1 | | |
O2 | | |
5.7. How much biomass was combusted or employed in processes? Please indicate the quantity of biomass as defined in paragraph 2(d) of Annex I to Decision 2004/156/EC combusted (TJ) or employed (t or m3) for each activity listed in Annex I to Directive 2003/87/EC.
In answering this question, use the table below.
Main Annex I activity | Biomass combusted (TJ) | Biomass employed (t) | Biomass employed (m3)
E1 | | |
E2 | | |
E3 | | |
F1 | | |
F2 | | |
M1 | | |
M2 | | |
M3 | | |
O1 | | |
O2 | | |
5.8. What was the total quantity of waste used as fuel or input material per waste type? What was the total quantity of resulting CO2 emissions per waste type?
In answering this question, use the table below. Add further rows if necessary.
[The waste types should be reported using the classification of the “European List of Wastes” (Commission Decision 2000/532/EC of 3 May 2000 replacing Decision 94/3/EC establishing a list of wastes pursuant to Article 1(a) of Council Directive 75/442/EEC on waste and Council Decision 94/904/EC of 22 December 1994 establishing a list of hazardous waste pursuant to Article 1(4) of Council Directive 91/689/EEC on hazardous waste.]
Waste type | Quantity used/deployed (t) | Quantity used/deployed (m3) | CO2 Emissions (t CO2)
5.9. Please submit sample monitoring and reporting documents from some temporarily excluded installations, if applicable.
Question 5.10 is to be answered in the report due by 30 June 2007 and in subsequent reports if changes were made during the reporting period:
5.10. What measures have been taken to coordinate reporting requirements with any existing reporting requirements in order to minimise the reporting burden on businesses?
In answering this question, use the table below. Add further rows if necessary.
[United Nations Framework Convention on Climate Change.] [European Pollutant Emission Register (Commission Decision 2000/479/EC of 17 July 2000), (OJ L 192, 28.7.2000, p. 36).] [National Emissions Ceilings (Directive 2001/81/EC), (OJ L 309, 27.11.2001, p. 22).] [Large Combustion Plants (Directive 2001/80/EC), (OJ L 309, 27.11.2001, p. 1).] [Co-operative Programme for Monitoring and Evaluation of the Long-range Transmission of Air pollutants in Europe.]
Which of the following statements applies to your country (add explanatory text if necessary)?
ETS reporting requirements are coordinated with other reporting requirements | Yes/No
Coordination with greenhouse gas inventory compilation under UNFCCC and Decision 280/2004/EC |
Coordination with EPER | Yes/No
Coordination with IPPC | Yes/No
Coordination with NEC | Yes/No
Coordination with LCP | Yes/No
Coordination with EMEP | Yes/No
Coordination with voluntary covenants | Yes/No
Coordination with other trading schemes (please specify) | Yes/No
ET data can be used by statistical office | Yes/No
Other (please specify): |
5.11. What procedures or measures have been implemented to improve monitoring and reporting by operators?
5.12. Is there any other relevant information concerning the application of the monitoring and reporting guidelines in your country? If so, please specify.
Question 6.1 is to be answered in the report due by 30 June 2007 and in subsequent reports if changes were made during the reporting period.
6.1. Please describe the framework for verification of emissions, in particular the role of the competent authorities and other verifiers and any special requirements for verifiers already accredited in another country. Please submit documents setting out the accreditation criteria for verifiers as well as any verification guidance provided for accredited verifiers and documents setting out the mechanisms for supervision and quality assurance for verifiers, if available.
In answering this question, use the table below. Add further rows if necessary.
[European Co-operation for Accreditation’s (EA) Guidance on the application of EN 45011.]
Which of the following statements apply to your country (add explanatory text if necessary)?
Independent verifiers can be accredited according to national criteria
(if so, please provide relevant documents or Internet link)
Yes/No
National guidance for verification developed
(if so, please provide relevant documents or Internet link)
Yes/No
Are national rules and procedures for verification based on EN 45011 and EA-6/01 | Yes/No
Verifiers are required to recommend improvements to installation’s monitoring | Yes/No
Competent authority or other agency has a right to check verified emission reports | Yes/No
Competent authority or other agency has a right to adjust the verified emission report if deemed unsatisfactory | Yes/No
Competent authority or other agency supervises verifiers (including spot checks, training, quality assurance and quality control procedures) | Yes/No
Competent authority has a right to appoint a verifier to an installation | Yes/No
Verifiers accredited in another Member State are subject to another accreditation process |
No
No, only formal requirements (registration, etc)
No for verifiers accredited in a Member State which applies similar criteria
Yes, simplified requirements
Yes, full accreditation required (if so, please briefly justify)
Knowledge of language and/or national laws/regulations required for verifiers accredited in another Member State | Yes/No
Special QA/QC procedures in place at CA for verifiers accredited in another Member State | Yes/No
Other (please specify): |
6.2. Did any operator provide an emission report for the reporting period not considered satisfactory by 31 March? If so, please provide a list of the installations concerned and the reasons why no positive verification statement was given.
In answering this question, use Table 6 of Part 2 of this Annex. Cases where operators did not provide any emission report must be reported under question 6.3.
6.3. For how many installations were no emission reports for the reporting period provided by 31 March? Please indicate the number of installations, allocated allowances and allowances blocked in the operators’ holding accounts per Annex I activity and within each activity per subcategory based on reported annual emissions (less than 50 kt, 50-500 kt and over 500 kt).
In answering this question, use Table 7 of Part 2 of this Annex.
6.4. Which measures were undertaken in cases where operators did not provide an emission report by 31 March of the reporting period?
6.5. Did the competent authority carry out any independent checks on verified reports? If yes, please describe how additional checks were undertaken and/or how many reports were checked.
6.6. Did the competent authority instruct the registry administrator to correct the annual verified emissions for the previous year for any installation(s) to ensure compliance with the detailed requirements established by the Member State pursuant to Annex V to Directive 2003/87/EC?
Indicate any corrections in Table 6 of Part 2.
6.7. Is there any other relevant information concerning the arrangements for verification in your country? If so, please specify.
Question 7.1 is to be answered in the report due by 30 June 2007 and in subsequent reports if changes were made during the reporting period:
7.1. Please provide any terms and conditions required to be signed by account holders and provide a description of the identity check of persons undertaken before creating holding accounts (cf. Commission Regulation (EC) No 2216/2004 [OJ L 386, 29.12.2004, p. 1.]).
In answering this question, use the table below.
[This includes ID checks by third parties like post offices or notary where the applicant has to present himself in person.] [This includes electronic procedures.] [This includes ID checks by third parties like embassies where the applicant has to present himself in person.] [This includes electronic procedures.]
Please provide the link to your registry |
Which of the following statements apply to your country (add explanatory text if necessary)?
Specific terms and conditions elaborated which account holders have to sign
(if yes, please provide relevant documents or links)
Yes/No
Different identity checks applied for operators and individuals | Yes/No
Personal presence required for ID checks for residents in Member State | Operators/Individuals/Both/No
ID check through written procedure only for residents | Operators/Individuals/Both/No
Personal presence required for ID checks for residents of other countries | Operators/Individuals/Both/No
ID check through written procedure only for residents in other countries | Operators/Individuals/Both/No
Copy of company register or similar documentation required for opening of operator holding account? | Yes/No
Documentation showing right to represent company required for opening of operator holding account? | Yes/No
Other (please specify): |
7.2. Please provide a summary of all security alerts relevant to the national registry which have occurred during the reporting period, how they were addressed and the time taken for resolution.
In answering this question, use the table below. Add further rows if necessary.
Which of the following statements apply to your country (add explanatory text if necessary)?
General procedures in place to prevent occurrence of security alerts | Yes/No
Security alerts relevant to national registries occurred during the reporting period | Yes/No
If yes, please fill out the following table
Type of security alert | Number of occurrences | Action taken | Time needed for resolution
7.3. Please state how many minutes for each month of the reporting period the national registry was unavailable to its users (a) due to scheduled downtime, and (b) due to unforeseen problems.
In answering this question, use the table below.
Month |
Scheduled downtime
[minutes]
Unscheduled downtime
[minutes]
January | |
February | |
March | |
April | |
May | |
June | |
July | |
August | |
September | |
October | |
November | |
December | |
7.4. Please list and provide details on each upgrade to the national registry scheduled for the next reporting period.
In answering this question, use the table below. Add further rows if necessary.