46 III. ASSESSMENT › 2. ASSESSMENT OF MERITS › 2.1. JUSTIFICATION ON GROUNDS OF MAJOR NEEDS REFERRED TO IN ARTICLE 30 OR RELATING TO THE PROTECTION OF THE ENVIRONMENT OR WORKING ENVIRONMENT › 2.1.4. The results of the risk assessment, Decision_act (EU) 2006/390

In force

The application of the modules has produced hazard indices (PEC/PNEC ratios) [The risk-assessment methodology, outlined in Commission Regulation (EC) No 1488/94 and further detailed in the Technical Guidance Document on risk assessment for new and existing substances, consists in calculating the ratios between the Predicted Environmental Concentration (PEC) of a given substance and the Predicted No-Effect Concentration (PNEC) of that substance in any specific environmental compartment. Risk is quantified by the PEC/PNEC ratio, a quantity referred to in the Czech report as the hazard index. A PEC/PNEC ratio below 1 indicates no risk to the environment, whereas a ratio of 1 or greater indicates a situation of real or potential risk; the larger the value, the greater the magnitude of the effect. Proportionate risk management measures are indicated in cases where the PEC/PNEC ratio is greater than 1.] in the range of 0,1-1,19, with a realistic worse-case value of 0,93 highlighted as justification for national restrictions, provided that the cadmium content in phosphorous mineral fertilisers does not exceed 50 mg/kg P2O5.

  • celex=31994R1488