Art. 40 Council Regulation (EC) No 27/2005 of 22 December 2004 fixing for 2005 the fishing oppor…

Inspection in port

In forcesince 22 Dec 2004
1.

Member States shall ensure that all vessels entering a designated port to land and/or trans-ship Greenland halibut caught within NAFO Sub-Area 2 and Divisions 3 KLMNO are submitted to an inspection in port in accordance with the port inspection scheme of NAFO.

2.

It shall be prohibited to discharge and/or trans-ship catches from the vessels referred to in paragraph 1 until the inspectors are present.

3.

All quantities discharged shall be weighed by species before being transported to a cold store or another destination.

4.

Member States shall transmit the corresponding port inspection report to the NAFO Secretariat, with a copy to the Commission, within seven working days from the date at which the inspection was completed.