For tunnels already in operation or tunnels whose design has been approved but which have not been opened to the public within 24 months following the entry into force of this Directive, Member States should be allowed to accept the adoption of risk reduction measures as an alternative to application of the requirements of the Directive, where the tunnel does not allow for structural solutions to be implemented at reasonable cost.
Recital 19, Directive (EU) 2004/54
In forcesince 29 Apr 2004